Just a quick one.
And I right in thinking I would take N/E from CU in shed to first fitting, take L from CU (with an E from fitting) all the way to switch, run switch L back to fitting and then just Dasiy L/N/E to next fitting?
not a lot of info on the web and didn't cover fluorescent fittings in the course.
Thanks in advance