OP
eco-tech
barx back off lol
After looking at the job today. Who ever installed the old light had no perm feed to switch 2 only two switch wires..
Result..................... re wired as a normal 2 way
After looking at the job today. Who ever installed the old light had no perm feed to switch 2 only two switch wires..
Result..................... re wired as a normal 2 way