C
cr0ft
Just sat this tonight. What does everyone that sat it tonight think of the paper?
Q1 I think was the list on page 17 of GN 3?
Q4 was something along the lines of why do we do an initial verification:-
1, Confirm installation/circuit complies with designer's intentions
2, Designed, Installed and Inspected & Tested to comply with BS7671
3, Not damaged so as to impair safety
Just seen it in some notes, not sure where it came from though as nothing in GN3.
Don't you have to add a x1.2 correction factor to the volt drop formula to allow for the rise in temp when the circuit is under load?
Good luck to everyboby, only a couple of months to wait.
v drop Q.... was it.... (R1+RN) X Ib
0.38 ohms x 30A = 11.4 ???????
250 v for surge protection