Hello people
Got job to replace/move cu going to be using 25mm 3 core swa as tails as ive never used swa as tails before im after a bit of advice. Do i earth armour of cable at supply end using a 16mm fly lead to gland. As im using the 3 core 25mm how do you terminate the earth in the cu earth terminal as all domestic cu ive seen only accept max of 16mm. One more question the customer has asked me to quote to install two showers one in main bathroom one in en-suite i thought two electric showers in one property was not good practice as could lead to over load problems if used at same time, with going down the route of installing equipment to allow only one to run at a time, time just wondered what others opinion on this was. Dont want to lose work, as i know some will fit without a care , advice please.
Ta
neil
Got job to replace/move cu going to be using 25mm 3 core swa as tails as ive never used swa as tails before im after a bit of advice. Do i earth armour of cable at supply end using a 16mm fly lead to gland. As im using the 3 core 25mm how do you terminate the earth in the cu earth terminal as all domestic cu ive seen only accept max of 16mm. One more question the customer has asked me to quote to install two showers one in main bathroom one in en-suite i thought two electric showers in one property was not good practice as could lead to over load problems if used at same time, with going down the route of installing equipment to allow only one to run at a time, time just wondered what others opinion on this was. Dont want to lose work, as i know some will fit without a care , advice please.
Ta
neil