Leesparkykent
Nearly Esteemed
Oh yes, my bad! But surely some will require just a single core no? The orange for instance?
The oranges are part of the valve flex. Each valve flex will have grey, brown, blue, orange and green/yellow.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss AM2 in the The Welcome Forum area at ElectriciansForums.net
Oh yes, my bad! But surely some will require just a single core no? The orange for instance?
@Matthew terry
How did your first day go at the AM2
Did you have to fit SY cable?
Did you remember to twist the armor strands, sleeve them and place them into the earth terminal and leave the inner insulation inside the backbox
Would look like that ^^^^
Or were you told to use a banjo on it and twist the strands around the gland and clamp them
EDIT The pictures don't show for me, please use the following links
https://www.jamiechivers.com/Images/6b2a0.png
https://www.jamiechivers.com/Images/6926d.png
Sorry was eating dinner.
I only have 3 core SY with me hahaha.
Bonus marks for using the piranha nut on the SY I only used those on the SWA
There should be a bolt for your crimp to connect on to on the backbox. At least there was when I did my AM2.
ALSO Just remembered something else, Your ring final circuits, how have you done your earth connections?
If you look on the back of the socket they specifically have 2 earth terminals, 1 for one earth in and one for out.
Usually, you do this for computer circuits but they specified we needed to do it in the exam.
I doubt the SY braid should be Green/Yellow.
Reply to AM2 in the The Welcome Forum area at ElectriciansForums.net