OP
gap30
Gap you will be ok mate you cant know everything but you can give it a go and as i have seen your doing enough mate
I put similar effort in and like you and was daunted at first.The more i read practised the more I started to understand, You think you wont know enough but I am sure you will.
I am sure you will find like I did because of all the study fly through it but take your time to read the quetions at least twice before rushing in
any your stuck on just move on and try to answer at the end
then read through it all if you have time until that cert drops on the floor you wont be 100% certain
But as you have put everything into it like me sure you will be OK
how long before the exam
11th August mate, brucelee can i run something past you mate
compile a list of 8 checks to be made during the inspection process that could apply to any type of electrical installation using any type of wiring system in any environment
now does this apply to 2.6.3 inspection checklist or,
2.6.2 comments on individual items to be inspected or,
the main headers on form 3
now after reading the question i am immediately thinking
connnection of conductors
identification of conductors
routing of cables within prescribed zones
basic protection
fault protection
selection of conductors for current-carrying capacity and voltage drop
presence of residual current devices
erection methods
but the ones i have listed are all from schedule of inspections, and the first two options i gave you are slightly different and go into more detail, i have almost memorised the schedule of inspections but am i right in thinking the question wants a bit more elaboration?
Last edited by a moderator: