I know it's only a C3 but I've been to quote jobs where previous electricians have told the client that they have to get it replaced to comply with current regulations which is false and basically scaring the client to get more work. I'm pretty sure that's not the case, as its only recommended. My apprentices tutor is telling him it's a C2 and any work done on the DB has to bring the current DB up to current regs (basically replaced with metal CU). Just because it's plastic and under thr stairs doesn't mean it fails the property on a condition report. I phoned the niceic and they have quoted saying that it is only a C3 and can be worked on provided it's still in good condition. What's everyone's thought on this because everyone has their own regulations it seems.
 
I know it's only a C3 but I've been to quote jobs where previous electricians have told the client that they have to get it replaced to comply with current regulations which is false and basically scaring the client to get more work. I'm pretty sure that's not the case, as its only recommended. My apprentices tutor is telling him it's a C2 and any work done on the DB has to bring the current DB up to current regs (basically replaced with metal CU). Just because it's plastic and under thr stairs doesn't mean it fails the property on a condition report. I phoned the niceic and they have quoted saying that it is only a C3 and can be worked on provided it's still in good condition. What's everyone's thought on this because everyone has their own regulations it seems.

Providing the Consumer Unit is in Good Condition and no signs of thermal damage then just a note on the MWC that it is Plastic and recommended to be upgraded to Metal just like a C3 on an EICR. That way at least you are covered.
 
I know it's only a C3 but I've been to quote jobs where previous electricians have told the client that they have to get it replaced to comply with current regulations which is false and basically scaring the client to get more work. I'm pretty sure that's not the case, as its only recommended. My apprentices tutor is telling him it's a C2 and any work done on the DB has to bring the current DB up to current regs (basically replaced with metal CU). Just because it's plastic and under thr stairs doesn't mean it fails the property on a condition report. I phoned the niceic and they have quoted saying that it is only a C3 and can be worked on provided it's still in good condition. What's everyone's thought on this because everyone has their own regulations it seems.
I don't think anyone on here is going to say it needs replacing, some may even argue that it's not even a c3.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Tumber92
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)

Thread Information

Title
Can i install a new circuit or do minor works on a plastic consumer unit under the stairs which is the only escape route.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
3

Advert

Thread statistics

Created
luketum92,
Last reply from
mainline,
Replies
3
Views
571

Advert

Back
Top