Why have they not wired the pump? Was it not ready for connection on the day?
Why are the fuses removed from the FCUs? Is there further work to be done?
You said your main concern was the FCUs (normal type) installed near the pipes - This is NOT a problem and is totally compliant.
Im not entirely clear why they didn't wire the pump or mixer... both were installed and ready for wiring, there is no water supply at the moment but they can both be dry tested.
The mirror will need adding at a later date as obviously I need to add the panels and tile before it goes up.
Thanks for clarifying about the FCUs. That was indeed my main concern.