SimpleSimon
Evening gents
Next week got an install. A sub-pump at the bottom of an estate being fed from 200m of SWA, about 120M of this will be underground the rest cleated to a the walls and roof.
The current is 3.8 per phase on a triple pole MCB. What I would like please is confirmation on the materials needed just so I can prepare myself.
200M of SWA
External glands at both ends with banjos and fly earths.
Cable Markings for underground.
Cable markings for identification at both ends.
Cleats.
6A Triple pole MCB.
IP rated junction box to connect SWA to pump flex.
Clear sealant.
Can any of you guys think of anything else or anything Ive overlooked?
Thanks
Next week got an install. A sub-pump at the bottom of an estate being fed from 200m of SWA, about 120M of this will be underground the rest cleated to a the walls and roof.
The current is 3.8 per phase on a triple pole MCB. What I would like please is confirmation on the materials needed just so I can prepare myself.
200M of SWA
External glands at both ends with banjos and fly earths.
Cable Markings for underground.
Cable markings for identification at both ends.
Cleats.
6A Triple pole MCB.
IP rated junction box to connect SWA to pump flex.
Clear sealant.
Can any of you guys think of anything else or anything Ive overlooked?
Thanks