Designing a new build installation at the moment and am looking to run 2 X swa sub mains from the incoming supply to small consumer units in a workshop and double garage. What is the preferrable way to connect these cables. I was considering via a fused dp switch unit or via two ways in consumer unit? All cables will be buried. Has anyone got any photos of similar installations?
Last edited: