should you install a earth rod if running a feed to a shed which is built on timber frame and is all timber , no metal parts and will have no services ie gas or water in it so no need for bonding only a supply for a light and a couple of sockets or can you use a pme earth from fuseboard if the shed supply is run in 6mm armoured from the outside of the house ( inside house 6mm t+e to fuseboard ) protected by 32amp rcbo will be installing a 2 way board with rcd main switch in shed approx 25 meters away
 
Everyone knows what is meant when they say 'extending the PME'. Nobody means physically extending it and taking over the DNO's job.

It is like correcting someone for saying 'sub-main' or 'ring main'. We all know what is meant and no real need to correct it.

I disagree, the forum is full of people from different stages from fresh faced apprentices to seasoned sparks, read the last several posts, it is clear members still have trouble understanding the systems and the differences 'by their own admission', I disagree also that this is somehow a similar comparison to ring and sub 'main' ... they were accepted and taught terminology it is only that they have been reworded that changed anything, PME and the term 'extending PME' with regards to a consumers side is wrong and has always been wrong, the fact it is a completely different system is why it shouldn't be casually used like it is, I have seen N/E linked together at a Distribution boards before, I expect they weren't sparkies who installed it but when incorrect terminology is banded around it wouldn't surprise me if they were...like you said, everyone says it but we know what we mean..Yes we do but not everyone knows is my point.

Either way, I'll break bread here and lets agree to disagree :)
 
A pure TN C S supply network and a PME'd TN C S network behave very differently under fault conditions. I know the DNO's can be a law unto themselves but surely they've got a national standard that dictates the multiple earthing point requirements a supply network must achieve to qualify as PME. Just calling a system PME when it's not can be dangerous for those designing end user installations on that system; you really don't want to locally rod a supply that's not PME'd whereas there's advantages to a local rod if it's a correctly multiple earthed TN C S supply.
 
That's the problem Marvo, can take months to get an answer sometimes from DNO as we are not privy to that kind of info normally, the only guide is a PME label on the cutout so if it ain't there then I don't treat it as one.
 
As you have stated previously you do not export the PME as this stops at the service head, you are exporting for want of a better word TN-C-S. The earthing system is judged at the service intake point and not what is occurring previous to it.
 
The earthing arrangement is pme , in process of joining cps scheme tried ringing for advice and they said they can’t give me any advice as not member yet
I will let you in on a secret with the niceic and elecsa if you know the regstration number from a member, its on most websites and similar then you enter it on the voice prompt menu on the phone, then they put you through. never asked for anything more!
 
As you have stated previously you do not export the PME as this stops at the service head, you are exporting for want of a better word TN-C-S. The earthing system is judged at the service intake point and not what is occurring previous to it.
read marvos reply above, he explains it properly.
 

Reply to Earth rod needed for shed supply or pme allowed ???? in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
956
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
I'm assuming the cable will have to be cleated well to hold it in place anyway, as a stuffing gland ain't going to hold it tight like a SWA gland...
Replies
10
Views
712
  • Question
Thanks for that guys I was more thinking about difference in potential between the tub and wet paving flags . The tub is plastic . But it’s the...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top