Do you pull sockets and switches forward? I find there's so much variation in what's required, in the regs it states not to dismantle, I fully test and then pull forward roughly 20% to have a look what it's like for sleeving and grommets etc but then I was told this can introduce faults by another guy I work with
 
Do you pull sockets and switches forward? I find there's so much variation in what's required, in the regs it states not to dismantle, I fully test and then pull forward roughly 20% to have a look what it's like for sleeving and grommets etc but then I was told this can introduce faults by another guy I work with

That completely depends on the nature, age, and condition of the system being worked on.
The sampling rate and the way you treat the disruption to the system will depend on your initial assessment of the system and the findings of your sampled inspection. If you are only pulling accessories forward slightly, how can you inspect the quality of terminations, whether insulation has been caught or not, whether solid drawn conductors are doubled over or not, how do you inspect the terminations for tightness ?
 
That completely depends on the nature, age, and condition of the system being worked on.
The sampling rate and the way you treat the disruption to the system will depend on your initial assessment of the system and the findings of your sampled inspection. If you are only pulling accessories forward slightly, how can you inspect the quality of terminations, whether insulation has been caught or not, whether solid drawn conductors are doubled over or not, how do you inspect the terminations for tightness ?

I meant 20% of number of accessories I pull forward to check termination etc then a more if they are done badly/looking bodged etc it's where to draw the line I struggle with
 
I meant 20% of number of accessories I pull forward to check termination etc then a more if they are done badly/looking bodged etc it's where to draw the line I struggle with

Lol, ah right. As a standard I start at 30-50%. A lot has to come off the facilitate testing anyway so the rest isn't much more work. If there are any problems, like Stanley slack wrist has done the initial install, I up to 100%. I also might start at 100% inspection if I feel the installation is old and/or in bad repair. This applies to domestic jobs only. Larger installs need assessing in more complex ways.
 
Lol, ah right. As a standard I start at 30-50%. A lot has to come off the facilitate testing anyway so the rest isn't much more work. If there are any problems, like Stanley slack wrist has done the initial install, I up to 100%. I also might start at 100% inspection if I feel the installation is old and/or in bad repair. This applies to domestic jobs only. Larger installs need assessing in more complex ways.

That sounds like a good plan of action! I can just about get 2 done in a day, people round my way do them £50 each and get 4-5 done in a day I just couldn't do it!
 
That sounds like a good plan of action! I can just about get 2 done in a day, people round my way do them £50 each and get 4-5 done in a day I just couldn't do it!
Leave those idiots to it. Are you an electrician or a toilet paper salesman ?

I can only do 2 in a day if they are small flats in the same building. Otherwise I charge a full day for an average 2-4 bedroom house.

There are plenty round here who do them for £80, just to get a shoe in to tell a load of lies and recommend a rewire. They are generally a good coat of looking at and a few EFLI readings, done in an hour. Utter garbage.
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread starter

cliffed

Arms
-
Joined
Location
Worcester
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)

Thread Information

Title
Eicr
Prefix
N/A
Forum
Electrical Wiring, Theories and Regulations
Start date
Last reply date
Replies
69

Thread Tags

Advert

Thread statistics

Created
cliffed,
Last reply from
Andy78,
Replies
69
Views
6,232

Advert

Back
Top