Hello,
I'm hoping someone can help with a bit of an urgent situation I'm in! I've just opened a new bar/restaurant after a lengthy refurb. Previously, the venue ran of a single-phase meter.
The refurbishments have been extensive and with all the equipment we've installed (ventilation, air conditioners, beer chillers & dispensers, etc) we have quite a few things that require 3-phase power. I arranged with my supplier to do a meter swap today ready for opening to the public. The electricians on the job had everything ready for this, literally just need to swap the meter over to a new 3-phase meter and all should be fine. Somewhere along the line, however, there has been a miscommunication with my electricity supplier (British Gas Lite). They turned up today and fitted a single-phase smart meter. The installer said that that was what was on his job sheet and couldn't tell me any more. I contacted British Gas Lite (several times) and the bottom line is that they refuse to swap out a single phase meter for a 3-phase. They will only do like-for-like. So now I'm stuck! Tonight we are open and it's boiling hot - desperately need air con to be on.
Any suggestions welcome on solutions to this. Can I get a 3rd party to install a 3-phase meter and still be on my British Gas Lite contract? Or do I need to try to get out of my contract and find a new supplier?? I'm concerned that if the latter, it's going to take weeks to get done.
Any help really appreciated!!
Will
I'm hoping someone can help with a bit of an urgent situation I'm in! I've just opened a new bar/restaurant after a lengthy refurb. Previously, the venue ran of a single-phase meter.
The refurbishments have been extensive and with all the equipment we've installed (ventilation, air conditioners, beer chillers & dispensers, etc) we have quite a few things that require 3-phase power. I arranged with my supplier to do a meter swap today ready for opening to the public. The electricians on the job had everything ready for this, literally just need to swap the meter over to a new 3-phase meter and all should be fine. Somewhere along the line, however, there has been a miscommunication with my electricity supplier (British Gas Lite). They turned up today and fitted a single-phase smart meter. The installer said that that was what was on his job sheet and couldn't tell me any more. I contacted British Gas Lite (several times) and the bottom line is that they refuse to swap out a single phase meter for a 3-phase. They will only do like-for-like. So now I'm stuck! Tonight we are open and it's boiling hot - desperately need air con to be on.
Any suggestions welcome on solutions to this. Can I get a 3rd party to install a 3-phase meter and still be on my British Gas Lite contract? Or do I need to try to get out of my contract and find a new supplier?? I'm concerned that if the latter, it's going to take weeks to get done.
Any help really appreciated!!
Will