Sorry if this has already been covered..... I’ve tried searching with no luck !

I’m after some info please on what is required to get set up to install EV chargers. Been getting a lot of calls on this lately, x3 this week so far.

Any info on it would be handy pros/ cons/ costs etc.

Cheers Sy
 
I have done the C&G course, simple enough to do. You then need to invest in a chargepoint test adapter (the Rolec one is around ÂŁ400).
You also need to register with each manufacturer that you want to install, Rolec, PodPoint etc and do their training to get approval to install their equipment.
Once you have done that you need to register with OLEV in order to claim the grants.
I did all this 12 months ago and have only installed 2 chargepoints, most of the dealers will have agreements in place with big national companies so it is difficult to break into the market.
Also OLEV are not the quickest at paying out the grant money (mine took nearly 4 months each time) and if there is anything remotely wrong with the paperwork they will also delay payment.
 
Do you have to do a course?
Can you not just install an EVCP if you know what you are doing?
Or is this in relation to the grants and the need to be registered with OLEV?
 
Do you have to do a course?
Can you not just install an EVCP if you know what you are doing?
Or is this in relation to the grants and the need to be registered with OLEV?
You can install without the course etc but you will not be able to claim the grant for the customer which for a home install is 75% of the cost up to ÂŁ500 so you would not be competitive for new installs.
 
As already covered you need to be in a scheme if installing home chargers as its notifiable.
For the olev schemes, you need to do acourse, city and guilds or a one day niceic thing. Then get manufacturer approval for each make via training days etc which is usually free. Some make you get the brands tester. Some makes will approve you for domestic chargers only if you arent NICEIC AC or equivalent.
Then apply to olev. Homecharge applications can be long as the paperwork is long. Workplace is much much easier.
You can fit one outside of olev schemes but as above you wont get the subsidy.
I have fitted 22 in the last year, between domestic and workplace ones. Its picking up and got more to quote for.
 
Can't see much call for ev in Devon. In most areas, the battery would flat before you got back from popping out for a loaf.

Bit more affluent in Bath. I bet some of those ev's struggle to climb some of those hills though.
 
As already covered you need to be in a scheme if installing home chargers as its notifiable.
For the olev schemes, you need to do acourse, city and guilds or a one day niceic thing. Then get manufacturer approval for each make via training days etc which is usually free. Some make you get the brands tester. Some makes will approve you for domestic chargers only if you arent NICEIC AC or equivalent.
Then apply to olev. Homecharge applications can be long as the paperwork is long. Workplace is much much easier.
You can fit one outside of olev schemes but as above you wont get the subsidy.
I have fitted 22 in the last year, between domestic and workplace ones. Its picking up and got more to quote for.

Thanks Gavin appreciate the helpful feedback ;-)
 
I have done the C&G course, simple enough to do. You then need to invest in a chargepoint test adapter (the Rolec one is around ÂŁ400).
You also need to register with each manufacturer that you want to install, Rolec, PodPoint etc and do their training to get approval to install their equipment.
Once you have done that you need to register with OLEV in order to claim the grants.
I did all this 12 months ago and have only installed 2 chargepoints, most of the dealers will have agreements in place with big national companies so it is difficult to break into the market.
Also OLEV are not the quickest at paying out the grant money (mine took nearly 4 months each time) and if there is anything remotely wrong with the paperwork they will also delay payment.

I've just completed a job installing three 7.2 kW chargers in a commercial environment under the Workplace Charging Scheme. I'm dismayed to have now discovered that I'm going to have to wait four months for payment of the ÂŁ1500 grant money from OLEV. I certainly won't be undertaking any more grant jobs, that's for sure. That's a lot of money to have to initially lay out, and a sum that will impact negatively on my cash-flow for the next quarter.

The whole grant scheme would appear to a bit of a con anyway:

The Great UK EV Charger Grant Mystery

The chargers that I installed were Rolec EVWP2026/WCS at a cost of £715.25 per charger. The 'WCS' part of the code denotes that the charger will come complete with GPRS metering equipment and a 3 year guarantee. These two conditions have been imposed by OLEV, and if you don't comply, you don't get paid. The standard model EVWP2026, however, can be bought for £389.99 from this wholesaler. So that's £325.26‬ of the grant gone straight away to cover the cost of the GPRS metering equipment.

Ergo the customer has in actuality been given a grant of ÂŁ174.74. And since any business or organisation who are awarded an OLEV grant are obliged to monitor the usage of each and every charger and forward the usage data to OLEV on a monthly basis, one has to ask if the inconvenience of doing so is worth it for the sake of ÂŁ174.74. Some will say it is, others will say it is not. Indeed, I've just won a job to install another charger of the same make and model for a different client who doesn't want to go through the grant process for this very reason. It is this type of customer to whom I will be marketing my services in future.
 
Informative.

I suspect, if I stay around a bit longer, that my next vehicle will be a hybrid or in bit longer, all electric. Guess I’ll be paying someone to install it

As an aside, much does it cost, to charge a car?
 

Reply to EV Charging info in the Electric Vehicles Advice Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
450
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

A day for sure. I recently installed an Anderson with dedicated CU. The run was a fair bit worse as I had to drop a section of ceiling and chop...
Replies
13
Views
718
The last ICS I fitted hadn’t been registered when it left their factory… so just got a “device not recognised” error. Helpline fixed it over the...
Replies
1
Views
224

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top