A
ayjay
go to bed
thanks tazz, helpful info, the spec is asking for a part 1 system throughout the building, plus an additional part 6 system in the flats (i have diagrams of where each device is required) Will just go with the one panel in cafe I think for the part 1 system, although I'm almost certain I've seen a system with a second remote panel on the same system it is clearly not common practice. thanks again