OP
sparkside1
That is what I was thinking.
I would have to IR the whole db with socket and light switches off.
Take Zs measurements and calculate R1+R2 values or R2 lead test at furthest point.
I don't believe there are RCDs in these properties so that saves time.
All the properties are modular and exactly the same.
The contractor said he will only deal with C1s.
The visual inspection would be done in 10 minutes on the fly.
The paperwork would have to be filled in on the way home in the back of the wagon.
The company are apparently well respected and known by NICEIC?
Surely there would have to be some pre-arranged limitations stated in the contract?
They said that any remedial works would be subbed out so broken rings would just be put down as a fail or C1.
I would have to IR the whole db with socket and light switches off.
Take Zs measurements and calculate R1+R2 values or R2 lead test at furthest point.
I don't believe there are RCDs in these properties so that saves time.
All the properties are modular and exactly the same.
The contractor said he will only deal with C1s.
The visual inspection would be done in 10 minutes on the fly.
The paperwork would have to be filled in on the way home in the back of the wagon.
The company are apparently well respected and known by NICEIC?
Surely there would have to be some pre-arranged limitations stated in the contract?
They said that any remedial works would be subbed out so broken rings would just be put down as a fail or C1.