Metal comduit as cpc | Page 3 | on ElectriciansForums

Discuss Metal comduit as cpc in the UK Electrical Forum area at ElectriciansForums.net

R

ryan24

Hi all.

whats people's thoughts on having class 1 switches and fittings on an installation that is wired in old imperial conduit acting as the sole cpc? If there's a fly-lead from switch to back box surely this will be fine? Getting a lot of mixed anwsers on this some saying no good others saying perfectly fine? I personally think it's not a problem as conduit can be the best cpc you get. Any one else dealt with this? Thanks
 
That's just it, it's not in fair sized projects, it's alterations in factories where I'm coming across it, and they seem to get away with it. As you say, the vast majority are just bodging around in peoples homes. A great deal of my income has come from work in small local industry over the last 30 years, maintaining and installing machines or just general installation. Some of the installation work I'm coming across, these days, is just downright pathetic......and unsafe. Can't even bend or ream conduit, some of these idiots....every bend has to be maufactured..and when it comes to circuit alterations they just couldn't care less, as long as it operates. Rubbish, believe me.
this will make you lol.

a pipe fitting firm is hired by main contractor to do a large job.

they then sub out all electrical, mechanical work etc and try to organise it.

sit back, feet up and lol
 
There's quite a few house bashers finding their way into commercial and industrial installs up my way too, just done an eicr for an engineering firm who let some house bashers loose on thier install as they were "value for money", twin and earths cable tied to trunking and conduits then open gromits used to get them into DB's or isolators, no CPC's for most circuits due to steel containment which was fine until the domestic muppets who can't work with galv pipe use plastic instead but don't take a CPC down from the trunking or fresh air out of a lidless trunking and go down the wall in plastic mini trunking. Took me ages to write up all the observations and from memory there were about 200 in total, now the engineering firm are up **** creek with their insurance company and are looking at a big bill to sort it all out

I come across loads of bodged work from house bashers and short course lads who blag thier way into a few of the chemical plants and a CHP plant I do work on too, one of the best was a lad who drilled a load of vapour proof lights to mount them with cable ties as he couldn't be arsed to mount them properly, last I heard he was a tutor at one of the local colleges


anyway getting back to the OP, nothing wrong with it if the steel pipes done right it'll put a separate CPC to shame any day of the week
 
There's quite a few house bashers finding their way into commercial and industrial installs up my way too, just done an eicr for an engineering firm who let some house bashers loose on thier install as they were "value for money", twin and earths cable tied to trunking and conduits then open gromits used to get them into DB's or isolators, no CPC's for most circuits due to steel containment which was fine until the domestic muppets who can't work with galv pipe use plastic instead but don't take a CPC down from the trunking or fresh air out of a lidless trunking and go down the wall in plastic mini trunking. Took me ages to write up all the observations and from memory there were about 200 in total, now the engineering firm are up **** creek with their insurance company and are looking at a big bill to sort it all out

I come across loads of bodged work from house bashers and short course lads who blag thier way into a few of the chemical plants and a CHP plant I do work on too, one of the best was a lad who drilled a load of vapour proof lights to mount them with cable ties as he couldn't be arsed to mount them properly, last I heard he was a tutor at one of the local colleges


anyway getting back to the OP, nothing wrong with it if the steel pipes done right it'll put a separate CPC to shame any day of the week
a floor in a new hospital wing in brum was done by house bashers.

the work wasnt great, everyone had finished before them and got called into help (different firm on each floor)

took one of the muppets a month to do 1 db lol

this size

[ElectriciansForums.net] Metal comduit as cpc
 
There's quite a few house bashers finding their way into commercial and industrial installs up my way too, just done an eicr for an engineering firm who let some house bashers loose on thier install as they were "value for money", twin and earths cable tied to trunking and conduits then open gromits used to get them into DB's or isolators, no CPC's for most circuits due to steel containment which was fine until the domestic muppets who can't work with galv pipe use plastic instead but don't take a CPC down from the trunking or fresh air out of a lidless trunking and go down the wall in plastic mini trunking. Took me ages to write up all the observations and from memory there were about 200 in total, now the engineering firm are up **** creek with their insurance company and are looking at a big bill to sort it all out

I come across loads of bodged work from house bashers and short course lads who blag thier way into a few of the chemical plants and a CHP plant I do work on too, one of the best was a lad who drilled a load of vapour proof lights to mount them with cable ties as he couldn't be arsed to mount them properly, last I heard he was a tutor at one of the local colleges


anyway getting back to the OP, nothing wrong with it if the steel pipes done right it'll put a separate CPC to shame any day of the week

Tough ----, you get what you pay for.

I very much doubt that. The required insurance is prohibitive without a track record. £1M wouldn’t get you through the door.
But what do I know, I was only the company site agent.

 
Tough ----, you get what you pay for.

I very much doubt that. The required insurance is prohibitive without a track record. £1M wouldn’t get you through the door.
But what do I know, I was only the company site agent.


Your right there Tony it's a shame it doesn't happen to more companies that take the cheap option

Again re the insurance your right BUT these chancers end up on these sites on the books with a firm that has the required insurances in place or through an agency, in most cases they don't last much longer than a single job but a lot of damage can be done by then
 

Reply to Metal comduit as cpc in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
277
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
269
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
350

Similar threads

  • Question
When you did the further testing and got the 0.06 reading were the CPC's back in the consumer unit? Really when testing you should leave the...
Replies
8
Views
1K
  • Question
Obviously not a building/DIY forum so will keep it short but yes - we've taken all the floors up. Several joists in the bathroom need doing as...
Replies
8
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top