Hello, anyone know when the regs recommending a switch fuse for meter tails greater than 3m long was introduced ? On older installations (about 20 years ago) was a switch fuse required on tails over 3m ?

Thanks
 
Thanks SP, i read that the DNO base the 3m rule on an assessment of risk (ie its less likely to be drilled through if the length is shorter) and not on any mathematical equations. Im sure there is something in the regs relating to this. I looked at an older install earlier, the tails are about 4m without a SF. If I were to quote for a new CU, should I (need to) install a switch fuse on the tails ?
 
Im thinking that as the (regs) are not retrospective, then if this install was completed before the 3m rule then it does not really need to be upgraded, but dont know when this reg (from IEE or DNO) was introduced. Im probably over thinking this but like to be sure, to be sure.
 
Thanks SP, i read that the DNO base the 3m rule on an assessment of risk (ie its less likely to be drilled through if the length is shorter) and not on any mathematical equations. Im sure there is something in the regs relating to this. I looked at an older install earlier, the tails are about 4m without a SF. If I were to quote for a new CU, should I (need to) install a switch fuse on the tails ?
Deleted
 
433.2.2 concerns devices for protection against overload, however the next one (433.3.1 [iii]) concerns omission of devices for protection against overload, and says a device can be omitted "where the suppliers fuse affords protection to the part of the installation between the origin and the main distribution point of the installation where overload protection is provided" (The CU in this case). So that rules that out. Looks like it is the DNO rules regarding tail length
 
Personally, I think I would install one if I were doing a board upgrade, the reason being they are typically after the meter which makes them the owners responsibility and since I'd be the one signing off, I'd want everything just so.

If the tails are already in place, and there is no isolator, then I'd get the switch fuse, install it at a suitable location (in the meter cupboard if you can) and have a kindly DNO engineer out to pull the fuse. If your DNO engineers are anything like WPD, have them pull the fuse, you then terminate the tails in the new shiny switch fuse, and they then re-energise. WPD charge per visit for pulling and re-inserting the fuse so if I have to have them out I line up an isolator before they get there so the client only gets one callout charge :)
 

Reply to Meter tails over 3 meters in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
438
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Thanks for the replies, I appreciate it.
Replies
4
Views
705
Think all has been covered already, but echo-ing the above if I was getting my DB swapped and had a 3 phase head, I would put a little TPN board...
Replies
5
Views
394

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top