S

She

Hello friends! My second post! So im just about to take on my first CU change over in SW London. Whats a good price for a full test and inspect, CU change over inc certs. Been looking on here at other posts but confused and the price gaps are massive?! Thanks Kellie :crazy:
 
3 Months to pass the 17th Edition, Ins & Test, domestic installer training. Inc Part P (Which was actually 18day's in total I just didn't have the time to do it all at once so that's why I said 3 months)
 
Bronze course? bronze medal is for third place isn't it? So does that qualify someone to carry out third rate work?

Judging by the 5week wonder's work I disconnected and removed the other week i'd say third rate was a compliment for the quality!

I looked at a domestic job the other which involves altering an MICC installation, i'd love to meet the domestic installer scheme graduate who can terminate that cable properly!
 
images.jpegI DON'T BELIEVE it.
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

YOUR Unread Posts

Daily, weekly or monthly email

Thread Information

Title
My first CU change!!
Prefix
Forum
UK Electrical Forum
Start date
Last reply date
Replies
110
Unsolved
--

Advert

Thread statistics

Created
She,
Last reply from
ipf,
Replies
110
Views
10,503

Advert

Back
Top