My last 'non Amd 3' CU Install. | Page 10 | on ElectriciansForums

Discuss My last 'non Amd 3' CU Install. in the UK Electrical Forum area at ElectriciansForums.net

Dave OCD

-
Mentor
Esteemed
Arms
Joined
May 5, 2015
Messages
4,158
Reaction score
7,261
Location
Cornwall
Put this in today, I hope it doesn't burst into flames.:tongue3: Didn't have the time to faff about and get the cabling 'perfect' as I had so much to do today but I think it's ok. With the BG boards I generally 're number' the earth bar as to me it's illogical having the CPCs running in the opposite order of the neutrals,I'll miss the insulated CUs. Sorry about the
poor photo. :)
[ElectriciansForums.net] My last 'non Amd 3' CU Install.
 
Board upgrades don't look as good unless the conductors or long enough. IMO when doing upgrades id rather have the board look a little untidy than add an unnecessary connection/point of failure just to dress the cables that little bit more neater.

I only ever extend cables if they won't physically fit into the terminals on the new board, other than that, I just work with what I have and do the tidiest job I can, it's just not easy with old cables that have little slack. I'll be the first to put a couple of mine up. And welcome criticism!

[ElectriciansForums.net] My last 'non Amd 3' CU Install.
[ElectriciansForums.net] My last 'non Amd 3' CU Install.

[ElectriciansForums.net] My last 'non Amd 3' CU Install.

The middle one was slightly tidied up where the rcd neutral feed is poking out before it was all closed up.
 
Last edited by a moderator:
the 100mA S type is to provide fault protection where the Ze is too high (as with a TT installation) to cause operation of OCPD within specified times. it is not there to protect against direct contact with live parts. this id down to the 30mA devices installed for the finals.
But as in Dave OCD install #40, the 100ma would be superfluous?
 
What are peoples opinions with regards to the arrangement of the MCB's?

I was taught at college to start with the highest In and work down from there. Making this as equal as possible on both RCD's.

I have also been told that it is better practice to have the bigger loads spaced out from each other because of possible heat etc. This would not be the case so much in a domestic setting though i think, maybe more applicable in industrial environments.

Any advice or opinions on this are appreciated. :smile:
 
Last edited:
Balance big loads over the 2 rcd's, the order isn't really an issue in domestic but in commercial and industrial then derating factors need to be accounted for, for heavy loading and mcb grouping.
Domestic I would have up sockets and d/s lights on one rcd then down sockets and u/s lights on the other so if a lighting circuit trips the rcd you can plug lamps in the wall sockets if it won't reset.
 
Balance big loads over the 2 rcd's, the order isn't really an issue in domestic but in commercial and industrial then derating factors need to be accounted for, for heavy loading and mcb grouping.
Domestic I would have up sockets and d/s lights on one rcd then down sockets and u/s lights on the other so if a lighting circuit trips the rcd you can plug lamps in the wall sockets if it won't reset.

Ok thanks fore the response. I guess my tutor just had his opinion regarding this then. :smile:
 
Ok thanks fore the response. I guess my tutor just had his opinion regarding this then. :smile:

Its common practice to load the heavy breakers first then the lightest loads last, I have not in my years been given a logical reason as to why and yes! I was also taught that way in the 80's. I wouldn't worry about order too much in domestic but like I said when stepping into other types of industry with heavier switchgear and loads then this advice becomes misleading and can cause premature tripping, overheating etc etc. I would be interested if your tutor can give a valid reason, putting a heavy load on the end will not reduce the momentary voltsdrop as the load is energised - if you suffer the lights flicking when you switch the kettle on etc then changing the mcb order will not reduce it as its a VD on the supply itself as it adjusts to the new load.
 

Reply to My last 'non Amd 3' CU Install. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
559
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
993
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
926

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top