- Joined
- Oct 9, 2010
- Messages
- 4,532
- Reaction score
- 1,512
I have just received inspection pads from the NICEIC for domestic and for supplies greater than 100amps. They have inspection schedules for both. The inspection schedule for the "greater than 100 amps condition reports" follows the regs with boxes to be filled in. Have an NIC inspection on the 9th of March so will ask what is required? seems there is confusion over this?:banghead:
Remember that the IET documentation is the minimum required but scheme providers can and normally do go their own way with paperwork.