I have two supplies to a single immersion heater in a customers house he has them both wired into the immersion and turns them on and off accordingly.
ive told him this is not safe.
he has a separate meter for peak and off peak.
now ive searched and was wondering if there is a timer/switch that accepts two supplies and uses the economy seven to run and the peak as the boost button.?
the horsman econ7 timer seems to do everything i want apart from the two inputs??
any help on this situation would be much appreciated.
mike