The Ring is dead, long live the Radial!⚡ | Page 12 | on ElectriciansForums

Discuss The Ring is dead, long live the Radial!⚡ in the UK Electrical Forum area at ElectriciansForums.net

You must be thinking of the Italians.

As the regulation restrict the amount of MCB's per RCD (eight) and the requirement to have separate radials for most white goods and other items the amount of RCD's soon mount up and lets face it we in the UK where very late in realising we should have two.
 
Last edited:
Wouldn't have made any difference anyway, the Gerries were behind them as well.....so much for the magnificent Maginot line.....we'll just go round it. :(
Maginot Line was a waste of time. they should have built it as a ring, not a radial.
 
Well at least there was a strong Resistance, must have been a circuit of some sort.
you need to speak to Rene about the resistance... listen carefully. I shall only say this once.
 
Are you mistaking multimeters for the Multi Function Testers (MFT's) we use for installation testing, we still use the standard multimeters but these are not capable of carrying out the tests needed to verify an installation

You've got a good point, can't do a megohm test with a multimeter.

To be more specific, as an electrician (installer), we're not required to do these loop tests, megohm tests on houses, last I knew anyway. I have been required to do these in factories for certain circuits as well as for feeders. On some jobs, ie: power plants, chip fab plants; we did have crews "commissioning" EVERY circuit, including feeders.
 
You've got a good point, can't do a megohm test with a multimeter.

To be more specific, as an electrician (installer), we're not required to do these loop tests, megohm tests on houses, last I knew anyway. I have been required to do these in factories for certain circuits as well as for feeders. On some jobs, ie: power plants, chip fab plants; we did have crews "commissioning" EVERY circuit, including feeders.
There is a very strong requirement here for dead testing before the circuit is energized, both for a full installation and for simply adding a new circuit to an existing system. That applies for domestic, commercial and industrial stuff.

Not just IR testing to see if the cable is OK, but also testing R1+R2 (live and earth resistances) both to verify socket & SP switch polarity, and also from the boards Ze (earth loop impedance) to check the circuit's Zs value is going to allow fast enough disconnection by the choice of fuse or MCB, etc.
 

Reply to The Ring is dead, long live the Radial!⚡ in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
709
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

I generally thought double stack boards were more for situations where a portrait design is better suited to the cupboard - you still generally...
Replies
4
Views
403
Not sure what you mean by pre-IP? as IP guidance was introduced long before 12v halogen downlights became 'fashionable'. That aside I would ditch...
Replies
2
Views
238

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top