Hi all,
Thanks for all information you gave here. I have looked throw the whole post but few points remain not that clear for me:
As far as I know, it is up to the costumer whether to install or not an export meter if P<30 kW but if P>30kW it is required. In both cases, the export meter could be installed separately to the import meter (i guess that means no need to removed the import meter already installed), then in which cases is it viable to install an import/export meter since this kind of device is more expensive?
For the installation of the export meter, does an MCS installer is allowed to do that job ? and for an import/export meter ?