I didn't have an issue with the long hours, hard work, quick pace or the in-house EAL training. Had other concerns.
I've recently seen a C.E. install in an expensive new build house, garage fed in 1.5 SWA from a SFCU in the house, that can be acceptable but the actual surface wiring in the garage is rough, awful clipping and I'd say it was very much rushed/thrown in without any pride in the job at all.