skyline2500cc
A new supply has been installed by SSE and its a single phase TN-C-S in other words neutral and Earth combined at the cutout or point of supply.
Meter tails have been installed to a distribution board which feeds one circuit. From that distribution board we need to run a SWA conductor from an MCB, 600 meters underground to an outbuilding which will have another distribution board to feed additional circuits.
We have looked into the cost of a 3 core SWA copper cable and its between 4-5K. I was wondering as the earth and neutral are combined do the regulations permit you from running a 2 core i.e Live and Neutral and using the SWA or (CPC)
as the earth.
Look forward to any advice
:icon12:
Skyline2500cc
Meter tails have been installed to a distribution board which feeds one circuit. From that distribution board we need to run a SWA conductor from an MCB, 600 meters underground to an outbuilding which will have another distribution board to feed additional circuits.
We have looked into the cost of a 3 core SWA copper cable and its between 4-5K. I was wondering as the earth and neutral are combined do the regulations permit you from running a 2 core i.e Live and Neutral and using the SWA or (CPC)
as the earth.
Look forward to any advice
:icon12:
Skyline2500cc