Hi all
Some of ya might remember, i started my nephews bathroom last year complete rip out and new everything.
anyway i asked about his shower 10.kw triton, got good feed back and told nephew he needs qualified
part p reg sparky, job went ---- up when he lost job etc, but is back on the go again ...today a sparky has
gone and wired up the shower BUT he has used the old wire from old shower , the problem is if my memory
serves me i was told that a 10.5 kw needs to be wired with 10mm wire ? the old shower was 8.5 and 6mm wire.
I told my nephew that he should not have used the old wire, but sparky said i'm not the electrician he his ?
should he have given my nephew a part p certificate of the job. ?
Some of ya might remember, i started my nephews bathroom last year complete rip out and new everything.
anyway i asked about his shower 10.kw triton, got good feed back and told nephew he needs qualified
part p reg sparky, job went ---- up when he lost job etc, but is back on the go again ...today a sparky has
gone and wired up the shower BUT he has used the old wire from old shower , the problem is if my memory
serves me i was told that a 10.5 kw needs to be wired with 10mm wire ? the old shower was 8.5 and 6mm wire.
I told my nephew that he should not have used the old wire, but sparky said i'm not the electrician he his ?
should he have given my nephew a part p certificate of the job. ?