Wiring of 3 Phase 63A Distribution Board | on ElectriciansForums

Discuss Wiring of 3 Phase 63A Distribution Board in the UK Electrical Forum area at ElectriciansForums.net

O

ozj999

I am planning to change my house's 20 years old DB to a new DB like in the website below:

http://www.electrolesk.com/Assets/db 3 ph web1.jpg

However, I am planning to use Hager 63A 10kA 3 pole MCB (model is: NC363A) instead of MCCB at the incoming. In addition, I plan to add in Hager Combined Over & Under Voltage Auxiliary, (model is: MZ214) and Hager type 2 SPD (model is:SPN465R).

Please advise on how to wire in both MZ214 and SPN465R in the DB.

Thank you very much.
 
Your a bit late to the party Khan ...the beer is drunk, the food eaten and everyone gone home... check the Threads date of posting ;)

PS welcome to the forum!

Dear.
I replied to this thread because I thought this is the best form for electrician and other members may find it helpful because a lot of people comes through Google searching for 63A DB installation.
Cheers
 
Well done for trying to help Khan, fair play to you, however darwood was trying to explain the horse had bolted 9 months ago and the OP may not ever come back here, you could start a new thread if you wanted to help members with information you have regarding 3 phase in the home, some overseas members may appreciate it where we in the uk usually will not unless there is a member here who lives in a mansion.
 
Mr Engr Khan, I've just had a look at your ''How to connect a portable generator to a home supply system'' I'd suggest that you should call this ''How NOT to connect a generator to a home supply system'' ....Better still remove those diagrams altogether!!

Have you never heard of a DP/4 POLE MTS or ATS?? An absolute must, when integrating a stand-by or portable generator into a normally mains supplied system. What you have shown in those diagrams is damned right out and out dangerous, not only to the homeowner but any poor electrical utility worker that thinks he's working on a disconnected/denergised supply cable/equipment upstream!! I can point out a few other discrepancies with your diagrams too, but...!!

To be honest, based on the above, I'm frightened to look at the other subject advice sections you have covered on your web site!!
 
Quite Hilarious actually, have a look at the pictures of wiring a 3 phase meter, they itemise the out going cables, quite funny no idea who the terget market is though.
 

Reply to Wiring of 3 Phase 63A Distribution Board in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
330
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
855
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
980

Similar threads

  • Question
much more information required. Is the supply to the first building a DNO supply or a sub main cable from another building ? if it is a sub main...
Replies
5
Views
952
Sooo the client has accepted that we don't want to be fraudulently taking electricity so that worry is out of the picture. But now basically the...
Replies
32
Views
5K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top