Hi.
Am working in a factory, most of the machinery on the main floor is fed from are fed from spurs (2/3 machines per spur).
As they have all been fitted with D type breakers, we need a tight Zs.
We have not got it.
I am trying to think of the easiest way of fixing it.
Turns out I'm not 100% sure what you can do with CPCs.
If each circuit has it's own dedicated CPC, can I also link a supplementary CPC (or even make a link between each CPC to have a star supplementary earth in addition to the original?)
I've flicked through the regs and can't find any info on supplementary earths!
The way I read it, is as long as all the CPCs are in the same enclosure you can do what you want!
Anyone with a bit more experience got a few tips?
Thanks,
Am working in a factory, most of the machinery on the main floor is fed from are fed from spurs (2/3 machines per spur).
As they have all been fitted with D type breakers, we need a tight Zs.
We have not got it.
I am trying to think of the easiest way of fixing it.
Turns out I'm not 100% sure what you can do with CPCs.
If each circuit has it's own dedicated CPC, can I also link a supplementary CPC (or even make a link between each CPC to have a star supplementary earth in addition to the original?)
I've flicked through the regs and can't find any info on supplementary earths!
The way I read it, is as long as all the CPCs are in the same enclosure you can do what you want!
Anyone with a bit more experience got a few tips?
Thanks,