My last 'non Amd 3' CU Install. | Page 14 | on ElectriciansForums
Guest viewing is limited

Discuss My last 'non Amd 3' CU Install. in the UK Electrical Forum area at ElectriciansForums.net

Dave OCD

-
Mentor
Esteemed
Arms
Joined
May 5, 2015
Messages
4,158
Reaction score
6,674
Location
Cornwall
Put this in today, I hope it doesn't burst into flames.:tongue3: Didn't have the time to faff about and get the cabling 'perfect' as I had so much to do today but I think it's ok. With the BG boards I generally 're number' the earth bar as to me it's illogical having the CPCs running in the opposite order of the neutrals,I'll miss the insulated CUs. Sorry about the
poor photo. :)
[ElectriciansForums.net] My last 'non Amd 3' CU Install.
 
id like to see the dimmer. was it in a theatre?

It's in a school hall, though it's the same as we fit in smaller theatres at the moment.

The job was a little behind due to waiting for the schools contractor to run (bodge) the supply in. So I ended up going back the day of the first performance of their nativity to get this fitted and a bar up as quickly as possible. We're going back to complete on the 4th I think, I'll get more pics then if I remember.

[ElectriciansForums.net] My last 'non Amd 3' CU Install.
[ElectriciansForums.net] My last 'non Amd 3' CU Install.
[ElectriciansForums.net] My last 'non Amd 3' CU Install.[ElectriciansForums.net] My last 'non Amd 3' CU Install.[ElectriciansForums.net] My last 'non Amd 3' CU Install.[ElectriciansForums.net] My last 'non Amd 3' CU Install.[ElectriciansForums.net] My last 'non Amd 3' CU Install.

The dimmer is a 24 channel 'bypass' dimmer. It has switched to bypass the dimmer circuit for each channel to provide hard power to that outlet.
Each channel is rated for 2.4KW and protected with a 10A SPSN mcb with an RCD per bank of 12 channels.
The maximum incoming supply is 80A TP, but most installs would be fine on a 32A or even 20A TP supply.
As you can probably tell the company who make them have been absorbed into the great EATON empire!

The isolator is the supply as provided by the school's contractor (NICEIC's finest), spot the obvious mistake!
The outgoing flex in flexi conduit is my temporary bodge to get it going for the school nativity play, it'll be replaced when we go back to finish off.
 
Let's see how many errors we can spot in one of my boards. This is a second hand board which I've fitted in the warehouse for the test bench and work bench.

View attachment 31036

I can put up a few pictures of a dimmer I fitted in a rush just before Christmas too if you want?

Looking outside, the SWA is not straight not one cable cleat in sight.? (just saying)
 
Some very impressive work there fellas, has anyone who's posted installs got any of the board partially installed ?
Are boards with all the cables from below slightly harder to get hyper neat ?

As long as you have sufficient cable it doesn't make alot of difference where they enter the CU, it's when you're swapping out an old unit and some cables are too short to reach the right terminals that it can start to get untidy. And RCBO boards are better IMO as you don't have all the big link cables getting in the way.
 
It's in a school hall, though it's the same as we fit in smaller theatres at the moment.

The job was a little behind due to waiting for the schools contractor to run (bodge) the supply in. So I ended up going back the day of the first performance of their nativity to get this fitted and a bar up as quickly as possible. We're going back to complete on the 4th I think, I'll get more pics then if I remember.

View attachment 31042
View attachment 31043
View attachment 31044View attachment 31045View attachment 31046View attachment 31047View attachment 31048

The dimmer is a 24 channel 'bypass' dimmer. It has switched to bypass the dimmer circuit for each channel to provide hard power to that outlet.
Each channel is rated for 2.4KW and protected with a 10A SPSN mcb with an RCD per bank of 12 channels.
The maximum incoming supply is 80A TP, but most installs would be fine on a 32A or even 20A TP supply.
As you can probably tell the company who make them have been absorbed into the great EATON empire!

The isolator is the supply as provided by the school's contractor (NICEIC's finest), spot the obvious mistake!
The outgoing flex in flexi conduit is my temporary bodge to get it going for the school nativity play, it'll be replaced when we go back to finish off.

nice job :wink_smile:

I keep getting bugged about replacing 3 dimmers...not really had much to do with them TBH. These ones have ABB MCB's.
 
Looking outside, the SWA is not straight not one cable cleat in sight.? (just saying)

At that particular point in time it dropped down to a coil sitting on the workbench below the board ;)
The supply board is immediately to the left of this one and the cable now does a neatish loop up to it. I think it's cable tied to the upright scaffold to the left (which is the structure of the workbench and mezzanine above)

As I said its our workbench so didn't exactly get tip-top tidying
 
It's in a school hall, though it's the same as we fit in smaller theatres at the moment.

The job was a little behind due to waiting for the schools contractor to run (bodge) the supply in. So I ended up going back the day of the first performance of their nativity to get this fitted and a bar up as quickly as possible. We're going back to complete on the 4th I think, I'll get more pics then if I remember.

View attachment 31042
View attachment 31043
View attachment 31044View attachment 31045View attachment 31046View attachment 31047View attachment 31048

The dimmer is a 24 channel 'bypass' dimmer. It has switched to bypass the dimmer circuit for each channel to provide hard power to that outlet.
Each channel is rated for 2.4KW and protected with a 10A SPSN mcb with an RCD per bank of 12 channels.
The maximum incoming supply is 80A TP, but most installs would be fine on a 32A or even 20A TP supply.
As you can probably tell the company who make them have been absorbed into the great EATON empire!

The isolator is the supply as provided by the school's contractor (NICEIC's finest), spot the obvious mistake!
The outgoing flex in flexi conduit is my temporary bodge to get it going for the school nativity play, it'll be replaced when we go back to finish off.

Is this labeling the three brown line conductors?

Or maybe the order of the harmonized ones to the neutral?

Thanks.
 
nice job :wink_smile:

I keep getting bugged about replacing 3 dimmers...not really had much to do with them TBH. These ones have ABB MCB's.

Give me a shout if you want any advice or need a hand, or someone to supply the kit.
As you can see it's no different to a DB really, the only slightly technical thing is the data side of it.

Most brands use ABB I think, with a little more info I could probably tell you a bit more
 
It's in a school hall, though it's the same as we fit in smaller theatres at the moment.

The job was a little behind due to waiting for the schools contractor to run (bodge) the supply in. So I ended up going back the day of the first performance of their nativity to get this fitted and a bar up as quickly as possible. We're going back to complete on the 4th I think, I'll get more pics then if I remember.


View attachment 31042
View attachment 31043
View attachment 31044View attachment 31045View attachment 31046View attachment 31047View attachment 31048

The dimmer is a 24 channel 'bypass' dimmer. It has switched to bypass the dimmer circuit for each channel to provide hard power to that outlet.
Each channel is rated for 2.4KW and protected with a 10A SPSN mcb with an RCD per bank of 12 channels.
The maximum incoming supply is 80A TP, but most installs would be fine on a 32A or even 20A TP supply.
As you can probably tell the company who make them have been absorbed into the great EATON empire!

The isolator is the supply as provided by the school's contractor (NICEIC's finest), spot the obvious mistake!
The outgoing flex in flexi conduit is my temporary bodge to get it going for the school nativity play, it'll be replaced when we go back to finish off.

Looks good Dave, has the bodger got the phase rotation wrong ? :D
 
Well this is now the hottest thread in the last 60 days !! just saying
What was the original post about now
 
Give me a shout if you want any advice or need a hand, or someone to supply the kit.
As you can see it's no different to a DB really, the only slightly technical thing is the data side of it.

Most brands use ABB I think, with a little more info I could probably tell you a bit more

cheers..I will PM you about it.
 

Reply to My last 'non Amd 3' CU Install. in the UK Electrical Forum area at ElectriciansForums.net

Recommended Sponsor News

Quickwire Now Sponsor ElectriciansForums.net

I am sure you will join me in welcoming our newest sponsors of ElectriciansForums.net - Quickwire! They have decided to join us after seeing you guys discussing their products here. Now we have an expert on board that you can chat to @Quickwire-Sam who will be happy to answer your queries!

[ElectriciansForums.net] Quickwire Now Sponsor ElectriciansForums.net


@Quickwire-Sam said "At Quickwire, we're all about speed, safety, and reliability. We're a family-run business, and every Quickwire connector is proudly made right here in the UK, ensuring noticeable quality. In short, Quickwire is the fastest connection method on the market. Whether you're an experienced electrician or a DIY enthusiast, Quickwire makes electrical connections ridiculously quick and easy. We're passionate about blending British craftsmanship with innovation. If you have any questions or if there's any way we can help, please just ask me!"

Exclusive Forum Offer! Free euro 2024 wall chart for first 10 responses!

Hi everyone,

We have 10 exclusive Uheat EURO 2024 Wallcharts to giveaway for Electricians Forum Members! The first 10 people to reply YES to this thread - I will message and get them sent out to you just in time for this years tournament! GO GO GO

PCBWay Now Sponsor ElectriciansForums.net!!

I hope you will all join me in welcoming our newest sponsor to the forum PCBWay! You can contact their friendly people by sending a message to @PCBWay who will be happy to answer your queries.

Welcome to the community and thanks for your sponsorship!

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

PCBWay provides services including PCB Prototype and batch Production, PCB Assembly (SMT), 3D Printing, CNC Machining, PCB Design, Electronics Modules Selling, etc. We are committed to meeting the needs of global makers from different industries in terms of quality, delivery, cost-effectiveness, and any other demanding requests in electronics.

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

Thread starter

Dave OCD

Mentor
Esteemed
Arms
-
Joined
Location
Cornwall
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Practising Electrician (Qualified - Domestic or Commercial etc)
Business Name
Hendry Electrical Services

Thread Information

Title
My last 'non Amd 3' CU Install.
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
254
Unsolved
--

Thread Tags

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top