If they are out in the sticks try selling them a ground source heat pump and thermal store for most of their heat. Ground Source Heat Pumps | GSHPA is the focal point of the ground source heat pump industry | Renewable Heat | Renewable Cooling | GSHP | Ground Source Heat Pump Systems -...
The customer might apreciate a couple of these fitted to key circuits Rayleigh Instruments RI-F384 1 & 3 Phase Meter RS485 Modbus RTU & Pulse Output - https://www.rapidonline.com/rayleigh-instruments-ri-f384-1-3-phase-meter-rs485-modbus-rtu-pulse-output-23-1534 so the sub circuits can be...
The fuse on the pole should have been pulled and a notice like Google Image Result for http://farm3.static.flickr.com/2854/10178983846_503cc1b2a9.jpg - https://goo.gl/images/nL9i3q displayed and an isolation permit obtained before working on the underground service.
I would strongly suggest the following:
1. Get a site visit from a Authorised Person at the DNO.
2. Once the hight limits have been confirmed then think about folding light columns that meet the hight limits.
3. If the customer doesn like the cost of the DNO visit then show them Horrific moment...
The sunbeds will have lots of filters in them each leak to earth. Fit rcbos, and if the customer wonders about the extra cost then explain if a bed goes faulty then he will only have an issue with 1/4 of his beds not all 4.
The fixings of the cable tray were in a poor condition of the accident.
The locomotive was a freight locomotive and can geneate 14 tons of pull force, it would take 3 tons to snap that cable...
An SWA feeding a signal box was cable tied to the cable tray on the side of a footbridge at a railway station. A train passing through the station snagged it and it went ping and recoiled down the platform....
Report 06/2018: Passengers struck by a flying cable at Abergavenny (Y Fenni) station...
Another idea, look at the oven and check the max demand on the rating plate, often it is less than 3Kw. If it is 3.6Kw, fit a 16amp double pole MCB in suitable encloosure at back of adjacent cupboard and feed this and hob from exisiting supply
Fit one of these to the main intake as a check meter, I think it does peak KVAR and KW . Rayleigh Instruments RI-F384 1 & 3 Phase Meter RS485 Modbus RTU & Pulse Output - https://www.rapidonline.com/rayleigh-instruments-ri-f384-1-3-phase-meter-rs485-modbus-rtu-pulse-output-23-1534