Search results

Search results

  1. O

    Can you spot whats missing.

    Ah I see, there are a few things thats rough about it, the service head isn't fastened to anything really, the 6 submains are just held with pinching glands and the new backboard is loose.
  2. O

    Can you spot whats missing.

    The tails from the Bemco go up behind the wooden board and loop into the top of the isolator.
  3. O

    Can you spot whats missing.

    Thats the one. Tails straight out of the Bemco (which only has fuses in in) and straight into the LL board via the isolator. There are a few blocks the same as this dotted around, I wonder if they are all done like this. Free electric for years, quite a new board as well, 2018 if the label was...
  4. O

    Can you spot whats missing.

    No, its not strictly electrically related, not as some kind of fault anyway. Its pretty obvious when you look closely.
  5. O

    Can you spot whats missing.

    Took me a while before I realised, the building is a block of 6 flats, all submains go to each flat with the meter and consumer unit located within the flats for each unit.
  6. IMG_20231127_131147_450.jpg

    IMG_20231127_131147_450.jpg

  7. IMG_20231127_131152_585.jpg

    IMG_20231127_131152_585.jpg

  8. O

    50v on swa banjo ? TNC-S system new build

    Surely the banjo is earthed if you are testing voltages to it, if you disconnected the earth to the banjo but the box or whatever its fitted to is screwed to a wall or something then you will still get some voltage between it and live.
  9. O

    What to pay day rate

    Its not that people wouldn't work for £250 a day, I would, but I wouldn't work as a subcontractor. I prefer to do my own thing, I could never stand there whilst somebody is telling me their way is best and what they say goes.
  10. O

    UK Frost Thermostat wiring

    You normally wire these in series with a pipe stat, so the frost stat turns the boiler on and as soon as the pipework gets hot then it switches it back off again, its only to stop the pipework freezing, not heat the rooms.
  11. IMG_20231120_142145_661.jpg

    IMG_20231120_142145_661.jpg

  12. O

    Wylex 3 phase board fitting.

    Thanks for the explanation, I'm not sure I understand everything but sort of get it, I've watched big clive tear down SPD devices before now and ween the gas discharge tubes inside them. I think the simplest explanation is it matters how short the cables are when they are across the mains as...
  13. O

    Wylex 3 phase board fitting.

    That makes sense thanks, must have been what JW was getting at ut I couldn't remember it.
  14. O

    Wylex 3 phase board fitting.

    No, bollox, must have clicked the wrong link
  15. O

    Wylex 3 phase board fitting.

    I remember watching a John ward video a while ago on SPD's and cable length and kind of understood it at the time but it just doesn't make sense to me now. The surge must originate outside the building somewhere and is brought in by the main cable I guess. This main cable could be any length...
  16. O

    Wylex 3 phase board fitting.

    The problem with this job is its 2 buildings into one, I think I posted a thread on it a while ago. Its one building with one entrance door but it has two of everything including incoming supplies/meters. The customer wanted it wiring this way so there are two mains units, one for the left half...
  17. O

    Wylex 3 phase board fitting.

    The newerclip in Wylex blanks are a big improvement on the others, they grip the sides quite firmly now. As you say the older type used to slide about all over the place, it was hard enough even trying to get a horizontal cover on with them in never mind a vertical one. I will look into the...
  18. O

    What to pay day rate

    Everyone wants at least £200 per day now, even for digging holes or filling skips.
  19. O

    Wylex 3 phase board fitting.

    Got loads of Wylex metal blanks, I presume they will fit in. As for surge, I'm going to fit a 3rd party one in an external enclosure, the price of the wylex one is ridiculous. Thats if it needs a SPD at all, not too sure of the commercial regulations.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top