Hello guys and gals,
I was just wanting to be a 100% sure before I do...
Are you ok issuing certs that have been edited and printed off?
For instance I am about to issue a Minor Works Certificate for a job I have just done in a shop.
I have moved a cooker point and connected a new cooker...
Hi people,
I am looking at dropping the pen and paper routine and moving to electronic certification. What are the differences in the above two? Also I tried phoning easycert but had rubbish reception so couldn't hear very well, how much does it cost in full including vat for there elec certs...
Frosty69
Thread
certification
certscertsure
easycert
including
niceic
scheme
software
i ordered some certs from nic the written ones as i hate giving them money i asked for domestic eicr and domestic electrical installation, they sent domestic eicr and eicr commercial and industrial. this isnt the first time they have sent the wrong ones, so i called them and they said purchase...
ive recently started working for an ECA registered firm having myself used Easycert for the past... god knows how long. they do not and will not use it even though its the best software i have yet used.
i'm trying to get hold of a fillable pdf cert (issued by ECA) to get to grips with before...
i used to be part p reg. with elecsa, due to illness i stopped working a couple of trs ago. however i am just starting up again self emp, but av not re reg. with any elec company ie. elcsa nic napit etc. can i still fill in minor works certs? or have i got to register again and be re-assessed...
Guys,
When notifying online with the ELECSA site, what goes in the BS 7671 Certificate number box on the third page.
Is it for example,
Minor works = Form 5
Thanks
Spoon242
Thread
certification
certscertsure
customer
elecsa
members
number
scheme
Hi,
I work for an overseas company who are building a process plant in the UK. We are employing a mixture of UK and overseas contractors. For the installation, commissioning and overseeing of the electrics and control systems we are doing the work ourselves as this is our area of expertise...
Davidghooper
Thread
certs
client
company
contractor
electrical
electrical work
overseas
staff
their
working
Hi guy's, Had a call yesterday from a kitchen fitter whos having a bit of bother with a customer, he didnt go back to re-grout some tiles so the customer called in some company called home care, who made a list of things wrong with their property i.e. dis-board not up to current regs., cupboard...
Hi I was wondering what certificate is required for changing just one 32A mcb to 40A mcb. It for 8.5 kw shower replacement, 15 meter of wiring is existing 10mm2 clipped to wall and there is a 45A shower isolator in meter cupboard.
Iv just got my part P registration with Stroma. I have to do notifications online, Do i still need to fill out certificates and give to the customer or will stroma do this on my behalf?
I was going to get some kewtech certs if i was ment to be issuing the certs? How does this work
Im used to...
Robo
Thread
certification
certs
kewtech
scheme
still
stroma
things
Does anybody know if a subcontractor (i.e. me!) working for a larger contractor (domestic work only) will need my own Part P registration and Elecsa/Napit etc. registration? Or could i be covered under their registration???
Thanks
dave
hi all , does anybody have a copy of a recent emergency lighting cert so I can do a verification cert or know where I can download one , also after a copy of the log book .
magpiemorgans
Thread
book
certs
electrical
emergency
emergency lighting
lighting
Evening All...
Have done numerous searches but cant seem to find the answer I'm looking for.
Help if you can please.
I have Mac and the time has come to upgrade my certificate software (currently running a freeby one through mac word which is a bit buggy)
Like the look of Easycert, but it...
i've just been offered a new job on the books , the boss was very keen to get me doing inspecting and testing for the company as they needed someone quickly to fill a gap.
the company are with NICEIC already. will i need to be assessed before i can sign stuff off. and are the company likely to...
hey guys !
I hope you all had a nice Christmas.
I had a quick question, I am still waiting for my MCS visit but I have already installed the panels to my house. I have done all the tests I had to do on my course (irradiance, Voc, Isc) we had a little form that we filled out on the...
Morning,
I did a 1st fix on a insurance job after flood damage.
Left new circuits marked up and isolated the old fuse board etc etc due to water damage and stated 2 week drying out needed.
The problem I now have is Im told by the builder the roof is still not fixed but the owner of the house...
Hi guys, i'm to replace a couple of cupboard luminaires, an extractor fan and a few SO fronts. They're all on the same circuit, RFC, the luminares and extractor are each on a 3A FCU. Being off the same circuit, can i put all these separate jobs/items on the one MWC?
Cheers
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.