Evening all. So got a job coming up; adding new circuit to exsiting DB. When I do my very, do I just need to do it for new circuits added, or do I need to list all circuits on the very even though I’m only adding new one? .
Evening all
Got an email from a prison we do work at who said they have been told that any circuits that contain emergency lights need to periodically tested every 3 years on top of the 5 yearly test.
I have looked through the IET but cant see any info on it? Can anyone point me in the right...
Had to install a ring main & cooker circuit for a new kitchen we have been doing.
The consumer unit is hager split load but is plastic. There is no room in the cupboard to add another board and the customers dont want to pay for a board change.
I guess i could just note on the form saying...
Good evening
I am currently a training to become an electrician. I do hold both initial verification and periodic testing qualifications however this is an issue I have never personally had to deal with and was never mentioned on any of my courses as often seems to be the case.
Basically I am...
Just processing an EICR and noticed a couple of final circuits measured Zs values (fed from a sub distribution board) slightly exceed the Max permitted Zs values for the OCPDs that protect them.
Obviously I will note this as a design flaw in the observations, but I just wondered, from the...
Hi
We live in a new build (2015) and the developer added Power and Lighting to the garage via a double socket (spur from house) and then a single light coming off the socket (via FS) for the garage. I then added another driveway floodlight off another FS.
Anyway, we plan to do some garden work...
what's your take on adding circuits to a full DB.
Warehouse unit,3p DB,full to capacity,new 3p circuit to be added,client refuses to upgrade DB.
Would you reconfigure a couple of circuits to allow for this new circuit.
Looked at a job for a old boy- and wanted to keep costs down for him and make my job bit neater/simplier
Job is to get new swa from new little rcbo board inside house to a external ip65 light switch and then into 6x external lights
then he also wants to power his little shed at end of garden...
Hello I'm an apprentice but don't do any domestic work just commercial and industrial atm.
My question is if you don't have a design current for shower or cooker e.g. customer doesn't know what they are buying yet, how do you select your cable sizes and mcb rating?
This is purely for learning...
I'm planning to get two single ovens and have been trying to find the best way to do the circuits. People seem to do it every way possible but I have doubts about some of the ways that they are done. The ovens I'm looking at are 16A appliances (max power is approx 14A), so I won't be plugging...
Given the demand for low energy lighting in new build/major extensions it seems that the LED technology leads the supporting equipment such as dimmers and timers.
The problem I have is that a client wants to put all the lights on each of four circuits on a 24/7 timer for security purposes (each...
Hi There,
I was called out to a house RCD trip which would not reset. An old style 10 way split board with a single 30 ma RCD (half without RCD protection).
RCD checks out fine but I found a faulty chandelier & replaced it with a single bulb for now. Also a faulty 12v transformer flickering; now...
Here’s a commercial scenario for you to comment on over you nightly dram.
So there is an existing consumer unit with older style MCBs or bs88 fuses. RCBOs cannot be added to existing and customer wont pay for a new consumer unit.
My soloution is to add a garage unit onto the side. Remove...
Hi,
I am a keen DIYer (dangerous phrase - I know) but will NOT be doing this work myself and will be getting a local sparky (Part P etc) in. However I'd like some advice as I want to check its the best way of doing things.
I have a Tenby split load Consumer Unit (circa 2005) in the Garage with...
Hi there, my name is Paul and I'm currently studying towards a city and guilds level 2 electrical installation, we are currently on lighting circuits for our practical, we have been given a task to wire up 2 lighting circuits using a 6 terminal hager junction box, I'm ok with wiring one circuit...
Just finishing a rewire, customer not sure on hob and cooker at design stage so I went for 2 circuits with 6mm withe 2 32amp rcbo's. Hob and cooker 5 meters apart. Now induction hob and oven have arrived onsite and both suggest a 13amp supply is suffice. Should I downgrade the rcbo's to...
Can't find the recent thread about this, but I've been looking at smoke detectors and got this from AICO under System Installation:
"• The supply for the mains powered alarms shall be taken from an electrically protected, regularly used local lighting circuit at the nearest source except for...
Evening,
Although I cannot see a specific regulation can anyone come up with a reason why someone could not run 2 line and 2 neutrals with both circuits fed from the steel wire?
To verify this would feed 2 number lighting circuits down one path, but
I.e 1No 5 core swa.
From a cost point of...
hi guys
I’m a qualified industrial electrician so I am competent working domestically however don’t have the official quals etc.
I’ve Recently bought my first house and if there was ever a time to do a rewire now is the time as the whole house requires decoration etc and I’m thinking of...
Hi
I looked at a contactor schneider ict 4 pole 400v 25a. The fault was a loud knocking noise coming from the electricial riser cupboard.
I suspected one of the contactors was pulling in and out rapidly (this known as chattering?)
I am hoping you can point me in a direction as I'm not...