when issuing a replacement boiler works cert I have been told to class it as and addition to an existing circuit.
but alls I'm doing is reconnecting a boiler to an existing supply by means of a 3amp 2pole isolator switch . any advise on what should be recorded??
thanks.
Hey guys,
Im a bit confused with this, a kitchen isn't classed as a special location, yet I've seen it excluded when issuing minor works certificates. I have the opportunity to do some work in a few weeks for a company that fits kitchens, the vast majority would be additional sockets, new...
Spark86
Thread
circuit
electrical work
kitchen
minor
notifiable
question
works
hi all
my question is do I have to be registered with a competent person scheme like the niceic or elecsa to issue a minor works certificate after doing minor works in a clients dwelling?
i have completed my part p and 17th edition also testing and inspecting
thanks
Thomas Grange
Thread
competent
cps
electrical work
minor
person
registered
scheme
works
Hi All,
Please can you advise on minor works certificates?
Some of our fitters are insisting on charging for two minor works certificates and some only charge for one, when they are doing work in more than one room. I believe that if all the work can be listed on the certificate then that is...
hi guys is it possible to buy Elecsa certs over the counter or can you only get them off there website ? ran out of minor works certs and need them sharpish.
cheers
I've recently installed some LED downlights in several bedrooms in my house, but it has recently been brought to my attention that I need the work inspecting and be issued with a minor works certificate.
Is it usual practice for homeowners to do their own installations and be issued with a...
After a bit of advice. A friend has had some structual building work done at his home so building control are involved.
Basically a new window which needed new steels ect. He re-decorated the room and put new socket faceplates on and changed strip light to 4 down lights. Building control have...
These are now going to be used within my job (lighting maintenance) the client want these for adding to circuits and also for changing like for like i.e light fitting for new light fitting, socket for socket etc.
My issue is with insulation resistance testing on lighting circuits incorporating...
Ste69
Thread
cert
electric
electrical
electrical installation
installation
minor
For you guys who carry out EICR's on a regular basis. After carrying out an EICR you issue an unsatisfactory certificate to your customer. At a later date the customer request that you carry out the remedial work in order to correct defaults on the installation. Question is, when codes C1...
I have been asked to go to a site where a periodic inspection was carried out in 2013. There were some 1,2,& 3's on the form which was not corrected at the time. The electrician his no longer about. The local authority has asked the owner why the items were not addressed and wants them...
On a test sheet I have, it says at the bottom of one of the sheets,
Registration number ................. (The registration number is essential information)
im im not sure what a registration number this means. If I can upload a pic direct from my tablet I will, I don't have any accounts to...
Manutd4life
Thread
electrical work
minor
number
registration
sheet
test
works
Hi,
I have had 3 phase cut-out and meters for 3 flats moved from my cellar to outside meter cabinet. Sparky has installed switch fuses and around 15 metres of SWA for each flat to relink to old supply point. Work looks decent so I am not disparaging said sparks work. I have a query though.
He...
The two pieces of work to be inspected? If I stick in a new cu, and from that cu run a new circuit, outside light for example would this suffice for both major and minor or do they prefer two separate properties. Sigh
alright chaps,
just a quick one, a few lads who are self employed that I know have told me that notifiable work goes through NIC or chosen body, but minor works ie utilising existing wiring or adding onto a circuit and EICR's are just kept on file and are covered by public liability insurance ...
Hi Everyone,
I have been a long time lurker round the forums but could now do with some advice. I have recently started my own business after being in the trade for 20 years. Most of my recent experience has been on commercial projects so I am a bit rusty when it comes to Part P. I am awaiting...
michaelg5
Thread
alarm
certificate
electrical work
minor
part
part p
smoke
smoke alarm
works
I was asked for my opinion today and we had that discussion today with a fellow spark regarding replacing a MCB in domestic with a RCBO /the board is to earlier edition of BS ans has no RCD/- I said it can be done with Minor Works cert as the GN3 mentions that if you change the whole consumer...
sparkyone
Thread
cert
domestic
electrical work
mcb
minor
rcbo
replacing
works
Got called to do a job today for a Landlord friend of mine to replace a Light pull cord fitting in "a room containing a bath or shower"
Look like someone has been hanging from the fitting and even had to replace the switch cable!!
Just checking this is still a repair and replacement and...
Paul Willoughby
Thread
cable
ceiling
cord
fitting
isn't
minor
notifiable
pull
pull cord
repair
replacement
switch
works
Hi All
Just wanted your views on this
The company i work for has installed a new replacement boiler and we haveinstalled a new programmer and wireless room stat.
we are using an existing circuit so a minor works will be used.
I’ve been told I’m going overboard certifying it, but i believe all...
andydj99
Thread
accessory
electrical work
minor
replacement
times
works
Hi guys
i carried out an ECR last week and it had a few category 1, 2 and 3. Obviously resulting in a fail which wasn't great news for the client. They said well there's no point in giving us an unsatisfactory cert and asked if I could do the works and issue a satisfactory grade. So iv since...
SensesFailYou
Thread
certs
complete
factory
issue
minor
unsatisfactory
works
hi some advise on a problem, plumber ask me to reconnect a y plan that was to an existing installation. on completion I was carring out a minor works certificate and noted that the installation had no gas and cold earth bonding, I have noted this on a minor works certificate and informed the...