100ms time delay rcd on main domestic unit?g | on ElectriciansForums

Discuss 100ms time delay rcd on main domestic unit?g in the Domestic Electrician Forum area at ElectriciansForums.net

C

cmp260

my house has 100ms time delay rcd main switch. why would this have been installed in a house? is it legal?
thanks
 
there is a 30mA Rcd half way down the bus
would this setup be acceptable for eicar or unsatisfactory?
also, there are two breakers which are lableled cooker and central heating, these are unused the wires go nowhere, , its lagacy of old house, cooker and ch are on kitchen ring now
should it fail eicar for this?
ta
 
there is a 30mA Rcd half way down the bus
would this setup be acceptable for eicar or unsatisfactory?
also, there are two breakers which are lableled cooker and central heating, these are unused the wires go nowhere, , its lagacy of old house, cooker and ch are on kitchen ring now
should it fail eicar for this?
ta

So it controls nothing? Why would it be a fail on an EICR?
 
worked in telcomms for many years matey, well up on electrics and hands on eletronics but not familiar with this stuff, dont worry im not diy, just wanna know exactly whats going on and dont wanna be taken for a ride by the bloke who failed my eicar,
 
No he is not taking the pee

Unable to trace final circuit... if he has it as a c2 its a fail, c3 then not, i thought it was c2 but im not 100% sure, hence the edit

Fail.. End of story
 
Last edited by a moderator:
cmp, you really need to explain what you have a bit clearer....

a 100mA RCD main switch feeding a few MCBs and a 30mA RCD which then feeds the remainder of the MCBs?

Nothing obvious wrong with that so far.
2 MCBs where the "wires go nowhere". So their are cables to these MCBs? where does the other end go to? is it terminated properly?
If this isn't clear then I'd put it down as needing more investigation.

You appear to be implying that someone has done an EICR as unsatisfactory. If this is the case what are the codes and comments?

EDIT: oops, Murdoch can type faster ;)
 

Reply to 100ms time delay rcd on main domestic unit?g in the Domestic Electrician Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
353
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
320
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
368

Similar threads

Also use a tails gland and clamp if available and make sure tails are secured to a wall. The danger here is a live to earth fault in the Consumer Unit
Replies
7
Views
538
I would probably C3 it, based on no contact with sharp edges, all the terminations being tight, and no signs of any thermal damage. With all...
Replies
2
Views
938

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top