cmp260
my house has 100ms time delay rcd main switch. why would this have been installed in a house? is it legal?
thanks
thanks
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss 100ms time delay rcd on main domestic unit?g in the Domestic Electrician Forum area at ElectriciansForums.net
would it make any diff if its lead or copper?What is the pipe that goes into the stopcock from outside, made of?
ok, i just paid a replacement spark ÂŁ250 to rectify problems and issue landlord cert. as i said, i dont mind paying for work done competently.
the probs the 1st company listed, turns out was a pile of crap. I asked first company for a refund but have not heard from them.
I need opinioins as to what I should do next, here is the email I sent to the first company.
I have had to hire another electrician to do the job since I never heard back from you with a quote or any interest in following up the job. I am quite unhappy that I have had to repeately chase you up in this manner and have had such difficulty getting answers to my questions.
Most troubling is the fact that there is incomplete and innacurate form filling of the report e.g. there is no ring end to end readings yet you have a derived an r1 and r2. As you are aware, this is not possible - and it is defninitely not acceptable on an official document.
There is a sentence on line one which does not make sense.
You failed items as C2 the extension cables under floor which I specifically stated to the workman when I pointed them out to him that I would remove, there and then, if it was considered a fail. He said, there was no need, he would only mark it as advisory not a fail, however it was marked as a fail in the report. So which is it? was the electrician incompetent for telling me that the cable was not a fail or was he right and but you decide to make it a fail on the form anyway?
I have been advised, that for a 4 bed house, it should have taken the better part of an entire day to do the job, not the 3 hours it took, so the job could not have been even done properly.
You have not used the latest, most appropriate form for a domestic inspection. it should have been a domestic installation condition reportnot a periodic inspection report.
In light of this situation, I am requesting that you refund me the ÂŁ80 fee you charged me since I did not get what I paid for.
ok, i just paid a replacement spark ÂŁ250 to rectify problems and issue landlord cert. as i said, i dont mind paying for work done competently.
the probs the 1st company listed, turns out was a pile of crap. I asked first company for a refund but have not heard from them.
I need opinioins as to what I should do next, here is the email I sent to the first company.
I have had to hire another electrician to do the job since I never heard back from you with a quote or any interest in following up the job. I am quite unhappy that I have had to repeately chase you up in this manner and have had such difficulty getting answers to my questions.
Most troubling is the fact that there is incomplete and innacurate form filling of the report e.g. there is no ring end to end readings yet you have a derived an r1 and r2. As you are aware, this is not possible - and it is defninitely not acceptable on an official document.
There is a sentence on line one which does not make sense.
You failed items as C2 the extension cables under floor which I specifically stated to the workman when I pointed them out to him that I would remove, there and then, if it was considered a fail. He said, there was no need, he would only mark it as advisory not a fail, however it was marked as a fail in the report. So which is it? was the electrician incompetent for telling me that the cable was not a fail or was he right and but you decide to make it a fail on the form anyway?
I have been advised, that for a 4 bed house, it should have taken the better part of an entire day to do the job, not the 3 hours it took, so the job could not have been even done properly.
You have not used the latest, most appropriate form for a domestic inspection. it should have been a domestic installation condition reportnot a periodic inspection report.
In light of this situation, I am requesting that you refund me the ÂŁ80 fee you charged me since I did not get what I paid for.
A Day to do a 4 Bed house? How many smoke breaks do you lot have?
How long would you take ?
Depends on Number of circuits/points/faults etc, but on the report shown, not a full day. Also depends on your test equipment and how efficient you do the test. Every house is different.
If we're talking about this 4 bed house still..No, but i wouldn't charge ÂŁ250 either like mentioned on here
Reply to 100ms time delay rcd on main domestic unit?g in the Domestic Electrician Forum area at ElectriciansForums.net