Came out of the March 2012 exam liteally 30 minutes ago, anyone done it? How did you find it?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss 2391 March Completed in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
I wrote
Only worth 1 point each but you'll only get the points for:
Cpc - a circuit within the installation An exposed conductive part
Main protective bond - extranious conductive part within the install i.e water or gas pipe
Earthing conductor - consumer unit the means of earthing
I tested the lighting circuit in two parts. Up to contacted and the from bottom of contactor to lights. IMO you would be doing well to hold contactor in and take readings logistically.
I answered the same - disconnect contactor and time switch and link out.Yeah I put link out contactor and time switch
Yeah it didn't state where the contactor and time switch were, while it said the DB was next to the supply intake.IMO you would be doing well to hold contactor in and take readings logistically.