Hi,
I have been asked to move some plug sockets from the skirting board (they are too low and this causes problems plugging in equipment) to higher up the wall in a domestic property. I will be chasing in and fitting new flush mounted sockets.
I am after advice on the best way to proceed. There seems to be several options. If the cable under the floor is long enough to reach the new socket position, then there will be no need to extend any cables and no major problems, but if it is not long enough, what is the best method for extending it? NOTE: The cable is in good condition so a full rewire is not necessary due to deterioration as it appears to have been changed in the late 70’s or early 80’s.
To get to the new socket if the cables are too short, I had planned either to use Hagar Maintenance free junction boxes, with the idea of spurring off the ring under the floorboards and having a single new cable to the new sockets, or I could extend both legs of the ring by crimping each conductor then putting the joint in a “chock box” for strain relief and to enclose the uncovered insulation. What is the best practice for extending cables in this circumstance?
Also, I think the best option for the chasing in and putting in the back coxes may be to take my equipment into a room (with three or four sockets) and do them together, then move all the equipment onto another room or location and do another group of sockets in the area. Is this a good plan, or is there a better way to do this?
I have been asked to move some plug sockets from the skirting board (they are too low and this causes problems plugging in equipment) to higher up the wall in a domestic property. I will be chasing in and fitting new flush mounted sockets.
I am after advice on the best way to proceed. There seems to be several options. If the cable under the floor is long enough to reach the new socket position, then there will be no need to extend any cables and no major problems, but if it is not long enough, what is the best method for extending it? NOTE: The cable is in good condition so a full rewire is not necessary due to deterioration as it appears to have been changed in the late 70’s or early 80’s.
To get to the new socket if the cables are too short, I had planned either to use Hagar Maintenance free junction boxes, with the idea of spurring off the ring under the floorboards and having a single new cable to the new sockets, or I could extend both legs of the ring by crimping each conductor then putting the joint in a “chock box” for strain relief and to enclose the uncovered insulation. What is the best practice for extending cables in this circumstance?
Also, I think the best option for the chasing in and putting in the back coxes may be to take my equipment into a room (with three or four sockets) and do them together, then move all the equipment onto another room or location and do another group of sockets in the area. Is this a good plan, or is there a better way to do this?