loop in loop out | Page 3 | on ElectriciansForums

Discuss loop in loop out in the Australia area at ElectriciansForums.net

we use a mixture depending on what is easiest for each light. Usually it is 3 plate at the ceiling rose. But on my last rewire i took the feed down to 2 of the sw's just for the outside lights, and then a 3 core outside.

If the client wants dimmers at the sw the minimum i would want is 35mm box even 45mm if there is 2 way sw in there for 2 or more lights. With all the neutrals and earths it can get a bit busy in there, and easy to crush cables with the possibility of snapping a conductor when trying to wrestle a flat plate dimmer back in!!

When terminating the bathroom cables in the loft, the way to go is to use a ashley box. It is easy to terminate in and means you can have a single cable to the light fitting. Keeping it all tidy for the fan and iso to.


spot on mark
 
Just that ive been to look at work and had a shock when i went to wire a loft light and there was no feed at the lights .and all switches on 1st floor had been chased up from floor , so there wasnt even a cable in the loft that i could cut into ,, ONE BIG DRAW BACK

That was done before you came. We're discussing how we do it. I do it the way that suits me and and don't worry about someone turning up after I've finished.

Never been Keen on joint boxes on new rewires

Neither have I, but it's an option and one that I use when it suits me.(usually a large loft with boards down, It can be easier to run all switches & lights to one location & do a j/b)
 
ANDY B

I know it was done before i was there, i was just stating a very big draw back to the switch system.
and that is my opinion

and plus on many domestic rewires i come across metal tube on switch dropps. and the loop switch idea will never work.

So am i right in saying you take fan isolator 3 core to switch as well.

at college i was taught to three plate twin and earth and to take feeds to switches on conduit wiring.

Im not saying its right ,just the way i was taught.

I will always 3 plate and then 2 plate if i have wall lights or tricky fittings.

too many draw backs to just solely doing 2 plate,
 
I have never been on a rewire yet where I didnt have to use at least two of the three main methods, and common all three. Very rarely 2.5 off ring to fcu on a three amp to a local lighting circuit. But I do pick difficult buildings. I consider the methods to be weapons in our armoury, the buildings deciding what I use.

spot on mark
I tend to rewire a lot of difficult houses, I consider all methods to be weapons in our armoury, and its common to use all three on the same house. The only one that I dont like is 2.5 to FCU 3 amp fuse and lights off that, as its to easy for someone to replace the 3 amp with a 13.
 
Last edited by a moderator:
I do loop in and out at the rose, unless its stud work then i do it at the switch. The reason behind this is as someone says its easier second fixing at the switch thats why i do i this way in stud. I use the rose method in brick/block etc so i can have an easier time making good.
 
All good points and pro's and cons to all methods,we tend to mix depending on what suits...but the simplicity of just one cable when the client presents a chandelier to go up makes the switch method very attractive.You could always run a 3 core up from the switch to the lights if you consider that a permanant live is ever going to be required in the future.
 
pendants 3 plate,downlights to switch as junction boxes very difficult to cram in loads of cables

am doing re-wire at the moment,15 spots and 2 wall lights in the lounge 10 cables(2 way) deep double box only way for me
 
Last edited by a moderator:
Please dont attack this is only what i was told on my first visit by the NIC ,

The inspector said that they did not like neautrals at the switches and if u did you should use double pole switches.

This was his view . not mine (im ducking for cover)
 
am doing re-wire at the moment,15 spots and 2 wall lights in the lounge 10 cables(2 way) deep double box only way for me
why dont you loop the switch wire at the downlights?[/QUOTE]

up and down on steps all day,call me lazy if u like lol but doing all connections at ground level suits more,besides this 4 bed house is having 80 downlights and im sick to death of them.
 
why dont you loop the switch wire at the downlights?

up and down on steps all day,call me lazy if u like lol but doing all connections at ground level suits more,besides this 4 bed house is having 80 downlights and im sick to death of them.[/QUOTE]
so oure going to take every s/w back to the sw? youre going to have to make a termination at the d/l anyway so whats another cable?
 

Reply to loop in loop out in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
317
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
842
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
965

Similar threads

Thank you, it is always good to hear another suggestion :)
Replies
6
Views
957

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top