Hi all, I'm after some thoughts on moving a meter and main fuse, the fuse and meter is mounted on a board which is obviously screwed to the wall. There is roughly 2m of incoming armoured above ground, so what are your thoughts on pulling the fuse, disconnecting the tails coming out of the meter relocating the the board where I need it then reconnect? I know there's issues with tags but the sparky that put the new c/u has already cut both tags on the fuse and meter to upgrade tails, I can't really see any problems because I'm not having to do anything on "there" side, what are your thoughts?
Thanks,
Adam
 
If you are getting the DNO to move it why not get it put outside they seem to like moving meters outside it should then be well out of the way . The cost ? think you fill a form in online and they get back to you or contact them by phone.
 
Just had the meter moved at my parents house this week.

2 1/2 hours, 2x men
Take down overhead supply to back of house, put up new overhead to front of house.
Clip cable along eaves and down wall to new meter box.
New head, fit old meter in new position and fit an isolator.
They even tested it and wrote the measured Ze on the head, with PME label too.

All for less than £1000.
 
If you look on the net there is a system design manual PDF. Once you’ve waded through the interesting (HV/MV) stuff you will find the requirements for moving a supply. It then becomes obvious why the cost varies from job to job.
 
Yes Mick hiVe been to 3 dno jobs moving g the meter all over £1000 and roughly moved about a metre to 2 metres
As he said we could have just said don't do it

Each job may diifer........ re London....informing Council to get parking space.chargeable to customer. If working on the highway which includes paths grass verges etc again Road openings have to be applied for from the the Council. There is more work that goes on behind the screen than meets the eye.Also if 3rd party involved like land owners and even looped neighbour's.
 
If you look on the net there is a system design manual PDF. Once you’ve waded through the interesting (HV/MV) stuff you will find the requirements for moving a supply. It then becomes obvious why the cost varies from job to job.

You don't need to read all that to see why the cost varies from job to job. Any electrician should be able to appreciate the reasons as it's no different to the 'how much to move a socket?' Question we all get asked on a regular basis.
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Advert

Thread statistics

Created
Adam Bunting,
Last reply from
7029 dave,
Replies
69
Views
5,618

Advert

Back
Top