r1 + r2 by taking away ze from zs | Page 2 | on ElectriciansForums

Discuss r1 + r2 by taking away ze from zs in the Australia area at ElectriciansForums.net

my post also. just wondering if that was one of the reasons it took me so long, i can't do more than 2 small dometic PIrs in a day.
 
but is it necessary on a PIR to measure R1+R2, as the circuit has already been verified when installed and energised. measurement of Zs, when compared to previous readings should confirm that the R1+R2 is satisfactory.

Good point
Figure of 8 and bridged rings and polarity of sockets
Anyone want to comment on guidance note 3
3.10.2

:)
 

Reply to r1 + r2 by taking away ze from zs in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
378
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
951
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
As previously posted, almost certainly due to differences in readings obtsined with high and low current measurements on the meter, low current...
Replies
10
Views
2K
OLDBOY
O

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top