I recently put a small 4 way db in a out building fed via a 6mm swa from the house db and i used the job as my annual inspection for napit the inspector said i couldnt use the earth from the house to supply this board without permission from the dno and would have to put in a earth rod even though it had a perfect ze, is this bs or have i missed something?