View attachment 2631View attachment 2630View attachment 2629View attachment 2628View attachment 2627View attachment 2626View attachment 2625View attachment 2631View attachment 2630View attachment 2629View attachment 2628View attachment 2627View attachment 2626View attachment 2625yes my mate kevin, is still calling me names, you can sort of guess
I was once attacked by a pair of bosoms but its too late now to tell that one
a scary one though
a mte of mine rented a workshop for his business, all looked smart and tidy, used to be a paintshop for custom cars, recent 3 phase board with spare ways, only down side sockets were all plastic and run in trunking
no supply was evident at the board, and I was told it ws supplied from an adjoining building that was closed, so I presumed the isolator had been shut off for safety
replaced all the sockets with metal clad fed by heavy gauge conduit, sorted the strip lights out and bonded the pipework
then fitted RCCBos as he was lone working and with trailing leads you need all the help you can get ( 16th ed then) unable to progress any further until access was gained,so we ran a temp supply from his old workshop, a few months later I was told power is on ready for you, I had removed the in line fuses on the 3 phases for safety just in case
when I went into the next door building I found guys working leads all over the place and a massive old 3 phase board from the 50s with no front panel at all, all live, the dis board for my mates workshop was fed from the bus bars off this!! and the main earth terminal was through a nut and bolt onto some rusty dexion shelving
worse the new users of this unit were rewiring it themselves
it was lethal, it turned out the whole industrial estate is like this with users doing their own work!!
I refused to couple the supply until a new dis board was fitted and wired correctly, the new owner moaned he had not budgeted for it??
I pointed out he had a 3 phase board with no front cover no safety cover bugger all earthing adn no means of isolating it as the switch has rusted, plus it was full of asbestos
gave him an ultimatum either get it done or I call the health and safety executive ( he had young kid working in there)
i have some pics someplace and will post them when I get a minute