schedule | Page 2

schedule

  1. happysteve

    Schedule of Test Results: editable PDF based on IET Model form

    happysteve submitted a new resource: Schedule of Test Results: editable PDF based on IET Model form - Looks just like the IET model form... but you can edit, save and print it in any PDF viewer. Read more about this resource...
  2. Sparky_marky2

    Certifcation software/apps recommendations

    Hi guys, I've been doing a bit of research into electrical software/apps as an alternative to the really bad Stroma software (Tracker Mobile) I currently have, I've sampled EasyCert Mobile which I found really straight forward however the layout in which it asked the questions didn't follow the...
  3. C

    schedule calculator apollo 500

    I'm using the inbuilt schedule calculator and get posed with the following options.# Enclosed or protected mains cabling exposed or unprotected mains cabling I guess enclosed means in conduit of some sort but I'm not sure about protected and unprotected mains cable seems a bit vague any ideas
  4. N

    Completing Zs box on schedule of test results

    When unable to carry out a Zs test on a lighting circuit (large/heavy chandelier type lighting), then the R1+R2 + Ze measurements are instead used and this is noted, but is it the norm to still write this value in the Zs box on the schedule of test results or just in the notes. I ask because...
  5. haptism

    R1 + R2 of ring circuit

    Hi for a ring circuit, is there any need to measure and enter R1 + R2 values on a schedule of results ? Because an r2 value is already measured (together with r1 and rn). If I needed a ring R1 + R2 value to calculate ZS (although i would find ZS with a socket tester so really no need; but if I...
  6. PhilCumbria

    Off peak and standard

    Hi I have just changed both an off-peak CU and a normal CU. I have tested both. Can i put them both on the same cert or do they need to be on two different EIC's ??
  7. dc-electrix

    Easycert - export schedule to excel/word etc

    Hi, Hoping someone who is familiar with Easycert can tell me how to export a DB schedule to excel/word. Apparently its been added as a feature in a recent update but I cannot for the life of me find how to do it. Any ideas? Otherwise I will email tysoft tomorrow for the answer.
  8. T

    E.I.C Installation report checklist

    Hi all A little clarification please if anyone can help. I work for a metering company installing modbus and AMR tenant sub metering and data logging equipment. when installing a new supply (1new circuit) from an existing DB for whatever purpose, we are filling out a full E.I.C cert if an...
  9. NDG Elecs

    FAO Strickers re DB schedule.

    I did a DB schedule on MS Excel. It is editable and you can add your own company details and logos etc. I print several off at once on to A4 sticker paper, and it gives a nice professional finish. I can email you the files if you PM me. I did try to upload them just now but could not due to...
  10. i=p/u

    help with schedule of inspections

    if you can help me along on the tick sheet cheers.. these are the faults i found today.. 1.Cable duct not sealed C3 2. unterminated sy cable laying on floor (not live) C3 3. Rcd for additional protection not tripping in required times C2 4 no discrimination between protective devices...
  11. HappyHippyDad

    What to enter on schedule of Inspections for EIC?

    Hello all, The Schedule of Inspection forms for an EIC offer you 2 suggestions to enter in the boxes, either a tick to say an inspection has been carried out and the result is satisfactory or N/A to show that an inspection is not applicable to a particular item. In section 7 (consumer...
  12. driverman

    Electronic EICR + EIC forms

    Hi guys, been away off this site for ages, glad to be back. No doubt been asked many times before,but is there is a link whereby I can download EICR / EIC forms just to use as a one off. Also as I'm very rusty filling in these forms, is there an explanation page for the Schedule of Inspection...
  13. H

    2395 practical assessment inspection schedule help

    Hello everyone I'm hoping somebody can shed some light on a few of the inspections on the Electrical Installation Condition Report. can somebody explain the following few querys and what it is they are looking to no. 4.4 condition of enclosures in terms of fire rating etc is this a metal clad...
  14. H

    2395 practical assessment

    Hello everyone I'm doing my 2395 practical assessment this week and I'm looking through my condition report inspection schedule. in the case I come up against a low ( < than 1 mohm ) value on mega ohms while completing a IR test which box in the inspection schedule should I code this fault...
  15. S

    EICR Inspection schedule

    I know theres a 'tick sheet' explained sticky at the top of the forum, but was wondering how we could put one together for the current inspection schedule ticket sheet. As the sticky at the top doesn't cover everything on the current one?
  16. NDG Elecs

    I have a DB schedule that other leccys might want...

    I have done a personalisable DB schedule that may be of interest to others. I have it in Excel format and can do it as a PDF. Don't know whether it would keep all the formatting in Excel on other peeps PC's, if it doesn't I can put in your details and send as a PDF when I have a spare moment...
  17. S

    National Schedule of Rates

    Not sure if the SOR is still in use, if it is, can anybody let me have a current copy please?
  18. R

    Excel cable schedule or similar

    Looking for either a good excel template or a nice piece of software to create a cable schedule, with the usual to from and cable size etc, termination details, anyone have one or knows of any downloads.
  19. S

    Schedule of items inspected on Domestic EIC

    im having a blank moment! when completing a cert for changing a consumer untit (Electrical Installation Cert) is the schedule of inspections relating to that? The only reason i ask is for example: routing of cables within prescribed zones - Well im only changing a consumer unit and adding the...
  20. M

    schedual of inspections question

    Sorry this may seem like are really daft question but during initial verification and testing do you issue one schedual of inspections for the whole installation or do you issue one for each circuit ?

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top