2391 V NICEIC - Whats the point in 2391?? | Page 8 | on ElectriciansForums

Discuss 2391 V NICEIC - Whats the point in 2391?? in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

Bonjour Messier, quelle heure est-il? Ou sont les toilettes?

Got a Grade 3 for that!
Allo, allo....J'oublie. Je ne comprends pas, tres bien. Avez vous une cuppa?
Got a brew for that.
 
Last edited:
If I understand correctly, to do electrical work in accord with BS7671 one needs to be competent. So the qualification is "competence". What is competence, I hear you ask? Being assessed and accepted by a Competent Persons Scheme is one measure perhaps ( o_O ). I can't speak for the Nice Guys, but with my mob they judge competence for EICR is shown when you have practical evidences and a training qualification (2391 for example).
Hi you are correct, so our friend has been mis-informed. You cannot sign off work unless you are a member of any of the schemes mentioned, but you cannot be a "qualifying officer" unless you hold BS2391 or the easier cheapo version of 2394 and 2395. C & G introduced the latter qualifications, because 2391 was too dificult to pass. What does that say for 2394 + 5 holders?
 
You CAN issue a certificate for your work with or without testing and inspection quals, and with or without scheme membership. Like I said it's notifying work that is made easier with scheme membership.
Hi Andy, you may be able blag your way through filling in a certificate, but without scheme membership, or qualification, no-one will accept it . Building control aren't going to accept a cert from a non qualified person, and insurance companies will just send it back without a scheme membership number.
 
Hi Andy, you may be able blag your way through filling in a certificate, but without scheme membership, or qualification, no-one will accept it . Building control aren't going to accept a cert from a non qualified person, and insurance companies will just send it back without a scheme membership number.
Really? Any evidence of this? Or is it well they will try anything to get out getting things done mentality?
 
Hi Andy, you may be able blag your way through filling in a certificate, but without scheme membership, or qualification, no-one will accept it . Building control aren't going to accept a cert from a non qualified person, and insurance companies will just send it back without a scheme membership number.

I was talking about filling in a certificate to BS7671. This has nothing to do with building control or insurance companies. Anyone who has done a proper electrical training should possess the competence to be able to test and cert their own work. Extra quals for testing and inspection are not necessary.
 
If you are a "qualifying supervisor" signing off certificates, but you aren't qualified to fill in the certificate, how does that work?
You need to be competent only.
You do not need a qualification to fill out and certify an installation in the context you speak of.
I have done the inspection and testing course only because my company requested or insisted I have it tho before doing it I had installed and tested for years
By obtaining the qualification I was able to achieve Approved Electricians status but it’s not relevant to every individual who completes certificates.
 
I was talking about filling in a certificate to BS7671. This has nothing to do with building control or insurance companies. Anyone who has done a proper electrical training should possess the competence to be able to test and cert their own work. Extra quals for testing and inspection are not necessary.
Hi Andy, so what you are saying, is that because you are a qualified electrician, you are automatically entitled to fill in a cert to cover the work you have undertaken. Why do you think that BS2391 was introduced? Its a level above 1st and 2nd fix installation. To gain 2391, you need to be able to understand the readings that your test equipment has just given you. You need to be able to correlate the readings, to what might be expected. I'm not trying to decry people from thinking that sparks should be confident in what they have installed, but 2391 gives you lots of mathematical equasions that can qualify your readings. Its not that simple. Thats why 2391 exists!
 
The 2391 qualification was introduced (as I have already pointed out) at the behest of the NICEIC as a requirement for the role of QS.
As for signing off their own work.
Any electrician working in accordance with BS7671 (regardless of qualifications), must be able to sign off their work.
 

Reply to 2391 V NICEIC - Whats the point in 2391?? in the Certification NICEIC, NAPIT, Stroma, BECSA Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
303
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
284
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
356

Similar threads

Yea that makes sense. Even tho I’m not registered with niceic yet as still need to do the extra training. I’m still signing the qs part?
Replies
6
Views
520
  • Question
My older card has it but my newer card doesn’t
    • Like
Replies
1
Views
637

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

  • exceeding voltage drop
    The cable is way undersized. If the voltage drop is detrimental to the installation I would make...
  • TT advise
    OK My take on the precautions to implement when omitting an up front RCD on a TT system. Tails...
  • SIL vs ATEX
    Good morning all, I have a question for those who are CompEx and SIL aware - I have various Ex...
This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top