Nicely done, correctly wired, cables fully into terminals, even on the double up required for the switched line.
I like the training method of using conduit tees, a useful one to remember for full conduit installs.
When you have the cables coming in and before connection if you sort the cores so the cpcs are pointing back toward the earth terminal, the neutrals toward the neutral terminals etc. then you can terminate them without having to cross over cores too much and makes for easier termination. A saving on sleeving can be done by using a shorter length, it may fall off more easily but wont get in the way so much.
You will later look back at these and think, hey, I struggled with that?