Search results | Page 8

Search results

You will need 50 posts under your account before joining in with this thread because you can't link out without 50 posts first.

  1. Flanders

    3 Phase Install

    If it's not been designed and just guest. Then you need to check the voltage drop on the cable . You will need various information to work this out including, max demand ,method of installation and length of run
  2. Flanders

    Zack values

    As above . 60947-3 are just switches so do not protect from fault current. You need to know the manufacturer and make of the 60947-2 mccbs . Then go on the manufacturers web site . Where some have tables showing you the max Zs and other tech data
  3. Flanders

    Coronavirus - Keeping it light :-)

    Working at a clinic the other day all the usual Covid saftey signs. Then found these on most of the chairs. I not sure what training I need to sit down !!!!
  4. Flanders

    EICR coding twin and earth tails/riser

    You make a good point and thanks this is good conversation, and so just to confirm an installation that was installed correct at the time of the 16th addition , could now be given an unsatisfactory report due to a code 2 such as cable not supported from premature collapse....
  5. Flanders

    EICR coding twin and earth tails/riser

    Yes I agree with this and yes the same danger applies. So really if my opinion is that an observation is a code 2 then I should code 2 it regardless of its age, My thought process was using the the seat belt analogy , you can drive a car without seat belts if was built before a certain...
  6. Flanders

    EICR coding twin and earth tails/riser

    You ask or look at this installation certificate. If you do not have that information then I agree you have to use you own judgment .
  7. Flanders

    EICR coding twin and earth tails/riser

    Ok my reasoning is this. If the electrical installation was installed after a regulation that was brought in as an improvement to safety, that regulation was not adhered to and I feel the regulation does prevent a potential danger then I would code 2 it. So my coding is based more to do with a...
  8. Flanders

    EICR coding twin and earth tails/riser

    Code 3 for cables buried less than 50mm in the wall . But if was design to the 17th addition or newer then I would and have given this observation a code 2
  9. Flanders

    Coronavirus - Keeping it light :-)

    Lol I think everyone at my school had one of them . If you lost your coat you just went to lost property and get another one
  10. Flanders

    Metrel MI3125 Eurotest Combo Lite

    Yes I have got one of them. Had it for a though years now the only problem I find is the leads seam to ware out giving higher and higher reading . Its ok for continuity testing as you can null the meter but the zs reading always seem to be on the high side. Also there doesn't seam be a shoulder...
  11. Flanders

    Anyone still use round JBs ?

    I think they where round to help with design. You would turn the lid to select how many entry holes you required. I did have to use one the other day as the wholesaler did not have any hager Ashley MF in stock but plenty of the 30 amp ones
  12. Flanders

    ElectriciansForums.net Advertisements Have Been Reduced, And Will Be Reduced Moreso Soon

    Yes it's much better now thanks. I dont use any add blockers and I normally view the forum on my phone. I just see one add per page like the attached picture . Which is not a problem at all ?
  13. Flanders

    when wiring catering van...

    All cables have to be the tri ratted type .not solid cores . As for surface conduit. Dont know of a reg to say you can't do this .It may be possible due to hygiene so surfaces can be cleaned down
  14. Flanders

    Meter tails >3 metres in length

    I believe is DNO rules but not written in stone
  15. Flanders

    Screws on Metal Backbox won’t tighten.

    Ok missed that not sure you can get 4inch 6s . Now I like Strima's solution.
  16. Flanders

    Screws on Metal Backbox won’t tighten.

    Fit red plug in back box and use a 2 inch 6 screw . Just make sure you don't snag any cables.
  17. Flanders

    EIC and EICR issues

    That's the problem with all electrical reports and certs, they are not easy for the layman to understand .all they know it has to say satisfactory on it. We could do with an official document in plain English that explains what paper work required for these scenarios. Then we can pass this to...
  18. Flanders

    EIC and EICR issues

    We get this a lot . I try and explain that the . original EICR cover the whole installation stating what is correct and well as what is wrong. The EIC and or minor works states that the observations( the wrong bits) have now been corrected . So now you have all paper work to confirm that the...
  19. Flanders

    Will you be having the vaccine?

    I listened to what Jonathan Van-Tam had to say today and did a really good explanation. I will to getting the Jab asap

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top